F.W. Taylor by Team 5 Flashcards
Work study maybe defined as the systematic objective and critical examination of factors governing the operational efficiency of an specific activity in order to effect improvement
Scientific task and rate setting
It is a study of movement of an operation or even of machine in performaing an operation with the purpoes eliminating useless motion
Motion study
The basic purpose of time study is to determine the proper time for performing the operation
Time study
The standard task is set without providing for measure to elimnate the fatigue it may either be beuond the worker or the worker may over strain themselves to attain it
Fatigue study
Taylor recommended the differential peace wage system under which workers performing the standard task within prescribed time or payed a much higher rate by unit than in efficient workers
Rate Setting
Having set the task within an average worker must strive to perform to get wages at higher peace rate necessary steps have to be taken to olan the production thoroughly.
Planning the task
Scientific management requires a radial change in the methods and produce selecting workers.
Selection and training
It involves tools and equipments ,speed , condition of work,materials
Standardization
Scientific management will not be complete without the introduction of specialisation
Specialisation
The management should try to ensure that the plant is laid out in the best manner and is equpted with thus tools and mationaries
Method study