Freshwater: 3 Gorges Dam Contemporary dam building expansion in one major drainage basin Flashcards

You may prefer our related Brainscape-certified flashcards:
1
Q

Cost of dam

A

US$22 billion - spent on construction, relocation of residents and financing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Reduced CO2 emissions by…

A

10 million tonnes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

When did the construction start?

A

1994

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the advantages of the dam?

A
  • Provided flood storage space. Flooding is a major problem for the seasonal river of the Yangtze.
  • Millions of people live downstream of the dam, large important cities, farm and industry = situated adjacent to the river = no floods
  • Hydropower saves the energy needed to mine, wash and transport the coal from northern China.
  • Renewable source of energy
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the disadvantages of the dam?

A

• Flooded 1,300 archaeological and cultural sites
• Displaced 1.3 million people
• Landslide killed 13 farmers
• 80% of the land in the area is experiencing erosion = deposition
• Dam sits on a seismic fault = could be blamed for increased seismic activity
• Erosion in the reservoir, induced by rising water, causes frequent major landslides.
o 2010: 97 significant landslides.
• Fish are affected by dams due to change in temperature and flow regime. Fish are hurt in the turbine blades of the HEP plants.
• Dam contributed to the extinction of the Yangtze River Dolphin, due to decreased habitat and increased ship travel.