Fresh Water and Wetlands Act Flashcards
Where has the US Army Corps of Engineer not ceded control over wetlands?
- Meadowlands
- Greenwood Lake
- Delaware River
How are wetlands defined?
- Hydric soils (wet soils)
- Hydrophytic Vegetation (wet plants)
- Presence of Hydrology (wet water)
What is a Letter of Interpretation (LOI)?
NJDEP written verification of wetlands boundaries
State Open Waters exceptions
- Groundwater
- Wetlands
- Artificial Lakes
- Detention Basins
What are the characteristics of Ordinary Wetlands?
- NO transition area required
- Swales, ditches, basins, isolated wetlands less than 5,000sf and surrounded by more than 50% development
What are the characteristics of Intermediate Wetlands?
- 50-foot transition area required
- Neither ordinary nor exceptional
What are the characteristics of Exceptional Wetlands?
- 150-foot transition area required
- Discharges to trout production waters
- habitat for critical species
Wetlands Transition Area rule exceptions
- Highlands: 300-foot transition area required
- Pinelands: 300-foot transition area required
- US Army Corps of Engineers regulated wetlands: NO transition area
Wetlands where NO transition area is required?
- Ordinary wetlands (<5,000sf and 50% development, swales and basins)
- Wetlands regulated by the US Army Corps of Engineers (Meadowlands, Delaware River, and Greenwood Lake)
Where is a 150-foot wetlands buffer required?
Exceptional wetlands
Where is a 50-foot wetlands buffer required?
Intermediate wetlands (neither ordinary nor exceptional)
What are General Permits?
27 permits for low-impact activities, some with maximum acreage requirements
Examples:
- GP2-Underground Utility Lines with a limit of 1 acres of impact
- GP10-Minor Road Crossings with a limit of 0.25 acres of impact
What are Individual Permits in the Freshwater Wetlands Protection Act?
- Permits that do not meet General Permit application
Requires mitigation: - Creation
- Enhancement
- Restoration
- Mitigation Bank
What is a Transition Area Permit?
Permits that apply to wetlands buffers only (waivers, wetlands averaging plans)
What activities are regulated within a transition area?
Permanent changes and any discharge or disposal