Fm1 Normals Chapter 3 Flashcards

1
Q

Below 10000 ft AGL, MCDU changes should be made by

A

the PM and executed only after confirmation by the PF.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The green dot will consider _____,______,_______,________

A

MACH speeds,
aircraft weight,
altitude and flap selected.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

For Flaps zero, green dot will indicated

A

drift down speed. For the remaining flap, green dot will indicate the respective flap maneuvering speed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The green dot speed indication does not account for

A

ice accretion. (i.e., it is not corrected after ice encounter. However, if flight crew wishes to use green dot guidance on icing condition EMBRAER recommends flying green dot + 10 Kts).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The weather radar should always be used for

A

night operations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Altitude callouts above 100 feet AGL are made with reference to the ______ altimeters. Callouts at or below 100 feet AGL are made with reference to ____ altimeters.

A

barometric , radio

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Upon arrival at the aircraft, the following procedures are normally accomplished in the designated order:

A
  • Safety Inspection – Exterior
  • Safety Inspection - Flight Deck
  • Power Up
  • Exterior Inspection
  • Cabin Inspection
  • Crew Briefings
  • Receiving Aircraft Procedure / Checklist
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

SAFETY INSPECTION - EXTERIOR

A

Surfaces and Chocks……………..CHECK Maintenance Status……………….CHECK

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Cockpit Emergency Equipment…………CHECK

A

• Protective Breathing Equipment (PBE) • Fire Extinguishers • Crash Axe • Life Vests • Escape Ropes • Flashlights

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The Electrical PBIT is automatically performed after _____________and takes about ______ to complete. The Electrical PBIT will be interrupted if ______,______,_______

A

the airplane is powered by any AC source…..
3 minutes…..
any electric hydraulic pump is running,
the FLIGHT CONTROL MODE Panel switches are cycled
or if AC source is interrupted while the test is running.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

all GP and MCDU operations that affect the aircraft’s flight path should be done by

A

Autopilot On
While the Autopilot is ON, all GP and MCDU operations that affect the aircraft’s flight path should be done by the PF.

Autopilot Off
While the Autopilot is OFF, all GP and MCDU operations should be called for by the PF and executed by the PM.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly