Flow/Checklist Triggers Flashcards
Before Landing Flow
Trigger: PF Calls for Gear down.
10,000 feet Climb Flow
Trigger: Climbing through 10,000 feet MSL.
Engine Start
Trigger: Completion of BEFORE START Checklist.
Postflight Flow
Trigger: Completion of SHUTDOWN Checklist or passenger departure.
Cockpit Preparation Flow
Trigger: Completion of POWER ON Checklist or completion of Post Flight Flow and preparing for subsequent flight.
After Landing Flow
Trigger: Clear of active runway.
Taxi Flow
Trigger: Clear of obstacles, established on taxi route.
POWER ON Checlklist
Trigger: Anytime electrical power is established for the purpose of aircraft movement.
After Start Flow
Trigger: Both engines started.
Exterior Preflight Expanded Flow
Trigger: Completion of Aircraft Acceptance Flow by one of the pilots.
Aircraft Acceptance Flow
Trigger: Pilot First flight of duty period or if maintenance has been performed on the aircraft.
Interior Preflight Flow
Trigger: Completion of Aircraft Acceptance Flow by one of the pilots.
After Takeoff Flow
Trigger: PF calls for flap retraction.
Transition Altitude
Trigger: Climbing through transition altitude.
Before Start Flow
Trigger: Ready to start engines.