Firescope 501 Flashcards

1
Q

What do hillside structure fires need to be successful?

A

Successful firefighting operations in hillside homes require consistent standard operating
guidelines, strong command, continuous and accurate size-ups, a well communicated
strategy, and effective firefighting tactics.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Three types of hillside homes

A

Ascending
Descending most dangerous
Cantilever

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are features of hillside homes that affect fire spread and collapse potential that should be taken into consideration

A

Layout floor plans and floor systems

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Follow up size up info on hillside homes

A

Type of hillside structure
Number of floors (above or below grade)
Location, nature, and extent of fire
Floor with the lowest elevation of involvement
The floor and side of building where initial fire attack lines will be deployed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

If unable to access hillside structure fire from at or below fire floor what can you do ?

A

Transitional attack

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Hillside fire attack team should attempt to

A

Determine how long the fire has been burning, perform a risk vs gain tactical analysis and ensure a backup line and team is in place if having to descend an interior stairwell.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Ventilation issues for hillside homes

A

Imperative first arriving units communicate specific location of the fire.
Access, building construction, layout, weather (wind)
Split levels make vert vent ineffective.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Mushrooming

A

If smoke and gasses are not released they bank down and spread laterally

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Where could you place vent hole on a split level home and what must be done before?

A

Over the stairwell

Well timed and Coordinated with fire attack with hose lines in place if not could create and undesired flow path.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Horizontal vent when?

A

When having to attack from above

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What could opening and closing of doors do on grade level ?

A

Can change the flow path and change fire behavior. Careful consideration should be given and only after communicating with fire attack group.
Could create flashover on floors above the fire

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Big thing on hillside size up

A

Identifying a portal or entry alpha, bravo etc.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Sounding floor systems

A

Sounding tool can be a false indicator

Using axe or similar to create an indicator hole

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Communications on hillside

A

Identify, initiate, and maintain control of the communication process and establish comm plan.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Ways to successfully navigate hillside homes

A

Training
Pre fire planning
Consistent operating procedures
Continual education

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Hillside home decision process

A

Size up with type of hillside home
360 number of floors above/below grade And subsequent size up
Determine lowest floor with involvement and communicate this info
Apply risk management policy
Initiate fire attack at or below fire
Coordinate vent horizontal vs vertical