Fires In Buildings - Module 6 (industrial / Commercial / Hospitals) Flashcards
When an MRI scanner needs to be shut down in an emergency (quenching) there are associated hazards of?
Asphyxiation
What are some of the associated hazards and risks that you could encounter with automated car parking and storage systems
Vehicles being stored at height
Objects and / or people falling from height
High fire loading as some structures can hold numerous vehicles
Unstable structures due to unprotected steelwork forming the frame of the vehicle storage structure being exposed to excessive heat
There are significant hazards associated with cryogenic injury due to exposure of the venting mechanisms in use, what liquid could you encounter within and MRI compartment?
Liquid Helium
Liquid nitrogen
Entry to automated car parking and storage systems should be attempted prior to the isolation of utilities on site, true or false?
True
Industrial and commercial premises have many associated hazards. What are some of the hazards?
Hazmats / hazardous processes
Complex design or layout
Insulated composite panels
Hospitals and Medical facilities have many associated hazards, what are some you. May encounter?
Biohazards
Radiation - irradiation / contamination
Lasers
MRI - magnetism / cryogenics
What impact does a faraday cage have on upon communications?
Blocks radio signals
Blocks incident ground radios
Blocks mobile phone signals
Can affect BA telemetry
MRI scanners (fixed and mobile) require 400v electricity supply. The magnetic field stops immediately when the power supply is isolated. True or false?
False
The 5 key elements needed for a dust explosion are ignition, confinement, fuel, dispersion and oxygen. What element can be omitted if the other 4 are present and still result in a dust explosion?
Confinement
What is the purpose of a faraday cage?
Block electromagnetic field
At any industrial or commercial property a safe system of work should be adopted and brought into place following DRA. This is done by..
Using SSRI details
Completing a thorough scene assessment
Collaboratively with on site personnel
A commercial control room may be provided at a building to assist the fire and rescue and / or management upon their arrival at an incident. What length of time should the fire resisting construction offer to enable it to function as normal in an emergency?
2 hours