FF Procedures Flashcards
What is the priority order for stairwell pressurization at a HRFPMD by the Vent Support group?
What due truck is the Vent support unit?
Attack Stair
Evacuation stair
Public Hallway
6th Truck Company
FFP 6.19.2
What is the tool assignment for the first due roof man at a fire in a HRFPMD?
Halligan
Hydra Ram
KO Curtain
How does the 1st due roof man access the floor above at a fire in a HRFPMD?
attack stair
How does the LCC access the roof in a HRFPMD?
via evacuation stairway
At a fire in a HRFPMD, who ensures elevators are recalled and searched?
2nd Ladder
Who searches 5 floors above the fire floor at a HRFPMD fire?
2nd Ladder
What is the tool assignment for the 2nd due Roof at a HRFPMD fire ?
Halligan, Maul, LSR, Life Belt
What is the tool assignment for the 3rd due truck at a HRFPMD fire?
Where should they operate?
Normal Compliment of tools and KO curtain
floor above the fire
Who initially ensures the evacuation doors are closed on the fire floor at a HRFPMD?
2nd due truck
What is the responsibilities of the 3rd due truck at a HRFPMD?
Confirmation the evac stairwell doors are closed on the fire floor, and are maintained in the closed position. This may be accomplished by positioning members on the stairwell side of the door
When can an 1 3/4” hose be stretched for a fire in a LRFPMD?
When every apartment door is within 50’ of every stairway on that floor.
What is the tool assignment for the Ov/Lcc team at a fire in a LRFPMD?
Ov- Halligan, Halligan Hook
Lcc- Halligan, Axe
Tool assignment for the roof FF at a fire in a LRFPMD?
Where do they operate?
Halligan, Halligan Hook, LSR, Life Belt
Roof
What is the priority order for roof access for the roof man at a fire in a LRFPMD?
Stairway in an attached adjoining building
An enclosed evacuation stairway
Aerial Ladder or Tower Ladder
What is the roof access for a fire in an isolated LRFPMD where there is only 1 open interior stair?
If the stairwell is not an IDLH- roof man to roof via interior stairs as long as the door is maintained closed by ladder officer.
If stairwell is an IDLH- roof man must be teamed up with another member. Roof man must communicate to officer that they are safely on the roof. Door must be controlled
What is the tool assignment for the 2nd due inside team for a fire in a LRFPMD?
Where do they operate?
Normal compliment of tools plus KO curtain
Apartment directly above
Also responsible for all floors and stairs above the fire floor.
Where does the 2nd due inside team operate for a top floor fire in a LRFPMD?
VES of fire floor (top floor) with 1st ladder company
Who brings the KO curtain at a top floor fire in a LRFPMD?
2nd Due Roof
Tool assignment for 2nd due roof man at a fire in a LRFPMD?
Halligan hook, Halligan, LSR.
If top floor fire, take KO curtain in lieu of LSR
Who takes the LSR for a fire not on the top floor of a LRFPMD?
Both the 1st due roof and the 2nd due roof
What is the color and size of the vacant building marking ?
lime yellow reflective paint, 18” X 18” square
lines 2” wide. made alongside the from entrance a height that is in line with the front entrance.
Location of the first line in a cellar fire in a taxpayer?
Stretched into the occupancy above the fire to prevent vertical extension.
Responsibilities of the 2nd engine company at a cellar fire in a taxpayer?
assist with initial line
supply sprinkler system
after supplying sprinkler, stretch second line
Who ensures the sprinkler is supplied at a taxpayer fire?
3rd Engine company
Where is the second handline stretched at a fire in a store in a taxpayer?
the first two lines are stretched into the store involved
Where and when can an 1 3/4” line be stretched at a fire in a taxpayer?
When compatible with fire conditions, 1 3/4” hose may be used in exposures.
Or light fire condition in main store.
7.1.2 7.1.4
Location of the second line at a cockloft fire in a taxpayer?
Into a separate seriously exposed building/ occupancy
What conditions would preclude the first engine from descending the interior stairs to extinguish a cellar fire in a private dwelling?
high heat conditions at top of stairs
questionable stability of the stairs
initial size up indicating a serious fire condition
Who can order a hose line re-positioned to the exterior entrance from the interior cellar stairs to extinguish a fire in the cellar of a private dwelling?
chief or ABC.
What has to happen first before re-positioning to the exterior entrance from the interior cellar stairs to extinguish a fire in the cellar of a private dwelling?
Urgent message by the chief acknowledged by members operating in interior.
Ladder members on the first floor must be removed.
Members on upper floors must withdraw to safe area.
Can a Bilco door be used for cellar access to advance a line at a fire in the cellar of a private dwelling?
yes but only if it is the only option.
Bilco doors are the least desirable of all the secondary cellar entrances.
Who is responsible for roof ventilation if it is needed at a fire in a private dwelling? (peaked roof)
second ladder
Who is responsible for the search and examination of the cellar at a cellar fire in a private dwelling where the first line did not advance into the cellar and the second hose line has been stretched to the exterior entrance for extinguishment?
Second due ladder
Who ensures roof ventilation at a fire in a flat roof private dwelling?
Second due truck
What is the tool assignment for the roof/ov team for portable ladder operations at a peaked roof private dwelling fire?
6’ halligan hook and/or halligan for each member
Where should a aerial ladder be placed at a peaked roof PD when used for roof access?
Extend ladder at least 5’ above and to one side of the peak
What is the tool assignment for the 2nd due roof at a fire in a flat roof private dwelling?
6’ halligan hook and saw
What is the tool assignment for the first due roof at a fire in a flat roof private dwelling
halligan, 6’ halligan hook, LSR
At traditional wood framed private dwellings, the amount of time before collapse occurs is generally estimated to be ___? If there is no ceiling to protect structural members, failure can occur within ___?
1 hour
20 mins
In private dwellings with lightweight materials, when fire extends from the contents to structural members, collapse can occur within ____?
5 to 10 mins
can occur suddenly with little to no warning signs
Areas unsupported by columns with spans greater than ___ are generally an indication that lightweight construction is present
25’
What is the roof man’s access to the roof at a brownstone fire, by order of preference ?
Aerial
2nd Aerial
Adjoining building
What is the roof man’s access to the roof at a row frame fire, by order of preference ?
Aerial
2nd Aerial
Adjoining building (not immediate)
What is the roof man’s access to the roof at a row frame fire, if the first ladder is a TL, by order of preference ?
TL
First arriving aerial
adjoining (not immediate)
What should the second due can man take for a top floor fire in a brownstone type row frame?
should consider taking 2 hooks in lieu of can
Where is the first line positioned for a cellar fire in a row frame building?
Through the front door to the cellar via interior stairs
If the 1st hose line can’t be advanced into the cellar due to the intensity of the fire in a row frame building, where should it be positioned?
It shall be used to protect the public hall and stairs.
Can be advanced to top floor after fire has been controlled by the second line. must check intervening floors.
If the first hose line has been advanced into the cellar via interior stairs to extinguish a fire in a row frame, where can the second line be stretched?
Back up first line. extinguish any fire on the 1st floor and then proceed to the top floor
Where should the second line be stretched for a cellar fire in a row frame where the first line is being used to protect the interior stairs?
To the cellar via outside exterior entrance
For a fire on the first floor of a brownstone type row frame, where should the second line be stretched if not needed to back up the first line?
To the parlor floor (2nd Fl) to maintain integrity of interior stairs
For a fire in a fully involved row frame, where fire is showing in exposures, where/ what should the first engine stretch?
3 1/2” to supply TL
line to enter fire building
For a fire in a fully involved row frame, where fire is showing in exposures, where should the second line be stretched if not needed to back up the first line?
To the top floor of the most severe exposure
For a fire in a fully involved row frame, where fire is showing in exposures, where should the third line be stretched if the second line is not needed to back up the first line?
To the top floor of of the opposite exposure that the 2nd line is operating in
Where should the first line be stretched for a fire in a vacant row frame building in a row of occupied buildings?
To the most severe exposure
Where should the second line be stretched for a fire in a vacant row frame building in a row of occupied buildings?
To the fire building or opposite exposure (if not needed to back up first line)
Where should the third line be stretched for a fire in a vacant row frame building in a row of occupied buildings?
To the fire building or opposite exposure, depending on where the first line was stretched to
Where is the first line stretched for a fire in a vacant row frame in a row of vacant buildings?
Operated from the exterior until LCS is set up, then moved to the most severe exposure.
Where is the second line stretched for a fire in a vacant row frame in a row of vacant buildings?
If not needed to back up first line, to an exposure or operated from a rear yard.
in class “E” systems, the fire command station has two way communications with which areas ?
Floor Warden stations Mechanical control center Elevators Air handling control rooms Elevator machinery rooms
High rise office buildings built before 1945 are “heavy weight “ buildings, usually weighing about __ to ___ lbs per cubic foot
20 to 23
Where are fire dampers found in the HVAC system of a high rise office building?
Where air ducts meet the supply airshaft,
Where the air meets the return airshaft
Wherever a duct passes through a rated fire partition
How is the HVAC system in a HROB placed in the non-circulating mode?
Opening all outside air supply dampers
Closing all mixing dampers
Opening all exhaust dampers
When should all HVAC zones in a HROB that do not include the fire area have their supply fans activated
Once the fire floor has been determined
What is the temp that will activate the fusible link on the fire damper in the HVAC system on a HROB?
50 degrees above the max temp normally encountered in the system
Where are smoke detectors located within the HVAC system of a HROB?
at the return airshaft on each floor