FAR 3.4 - PP&E Cost Basis Flashcards
PPE is recorded at historical cost, however how are donated dined assets recorded?
Fair market value and result in a gain on the income statement
When land has been purchased for the purpose of constructing a building, all cots incurred up to what are considered land costs?
All costs incurred up to excavation for the new building
Land improvements are depreciable and include:
Fences
Water systems
Sidewalks
Paving
Landscaping
Lighting
When preparing land for construction of a building, how are the following costs designated between land cost and building cost:
Filing in a hole or leveling
Digging a hole for the foundation
Filing in a hole or leveling = land costs
Digging a hole for the foundation = building cost