Evolutions Flashcards
EV01 Forward Lay
Procedure.
lay supply line, set brake and engage pump, crack tank fill, chock wheels, grab spanners/inline valve, break supply with spanners, connect inline close and bleed air, attach 50ft LDH, open inline valve, open intake, close tank to pump, set relief valve. “secure water supply”
EV02 Reverse Lay
Procedure. Initial Operator?
Initial- use tank water, break 50ft LDH from intake, attach supply engine to intake valve, anchor LDH and give driver “OK”
EV02 Reverse Lay
Procedure. Supply Operator?
Spot engine 30ft from initial engine intake, break AHV from LDH, pulls hose and hands coupling to Initial operator, 5mph to hydrant, use AHV and LDH 50ft to connect hydrant, break LDH from hose bed and connect to LDH discharge, “ready for water?”, close tank to pump, open discharge and throttle to 50 psi, adjust as needed.