In ECA-3.1 state the procedure transition if any SG pressure is decreasing in an uncontrolled manner -OR- any SG is completely depressurized and has not been isolated

A

Go to E-2 Faulted SG Isolation, Step 1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

In ECA-3.1 state the procedure transition if any SG level increases in an uncontrolled manner.

A

Go to E-3 SGTR, Step 1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

State procedure transition at Step 13 of ECA-3.1 if RWST level is <310,000 gallons

A

If RWST level is <310,000 gallons then check Figure ECA-3.1-1 and determine is level is less then expected. If less than expected then Go to ECA-3.2 SGTR with loss of Reactor Coolant - Saturated Recovery Desired, Step 1
This is to conserve water.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

State Procedure transition in ECA-3.1 at step 13 if SG NR >96%

A

Consult with TSC and go to ECA-3.2, step 1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

In ECA-3.3 SGTR without Pressurizer Pressure Control state procedure transition if ECCS flow has been terminated and subcooling <40F or RVLIS is less than required for plant conditions

A

Manually align valves and start ECCS pumps as necessary and go to ECA-3.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

In ECA-3.3 state procedure transition if an RCP can be started

A

Once an RCP is started then go back to E-3 at step 17 and use normal spray to depressurize RCS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

In ECA-3.3 state procedure transition if a PORV becomes available

A

Once a PORV becomes available then go back to E-3, Step 18 and use PORVs to depressurize RCS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

In ECA-3.3 state procedure transition if an SI pump and Charging pump becomes available

A

Once Aux spray is in service then go to E-3, Step 17b and use aux spray to depressurize RCS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

In ECA-3.3 state the procedure transition if RCS subcooling is <40F

A

Go to ECA-3.1 SGTR with loss of Reactor Coolant-Subcooled Recovery Desired

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

In ECA-3.3 state the procedure transition if an adequate heat sink can not be established

A

Go to ECA-3.1 SGTR with loss of Reactor Coolant-Subcooled Recovery Desired

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

In ECA-3.3 state the procedure transition if RVLIS indication is not with in requirements

A

Go to ECA-3.1 SGTR with loss of Reactor Coolant-Subcooled Recovery Desired

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

In ECA-3.3 state caution about implementing FR-P

A

In ECA-3.3 do not implement FR-P until after performing step 15. (Charging and LTDN has been established)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

In ECA-3.3 state the procedure transition if pressure control is established and PZR level is restored to >7%[28%]

A

Go to E-3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

In ECA-0.1 state the caution about SI at the beginning of the procedure

A

If SI is actuated prior to Step 3 of ECA-0.1 then reset SI to permit manual loading of equipment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

In ECA-0.1 state when FRPs should be implemented

A

FRPs can be implemented after the completion of Step 9 (placing non-operating equipment in standby)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

In ECA-0.1 state the procedure transition if either RCS subcooling <40F -OR- PZR level <7%[28]

A

Go to ECA-0.2 Loss of all AC Power Recovery with SI required

17
Q

State procedure transition at the end of ECA-0.1

A

Go to ES-0.2 natural circulation Cooldown, Step 1

18
Q

At the end of ECA-0.2 State the procedure transition

A

Go to E-1, Loss of Reactor or Secondary Coolant, Step 1

19
Q

At the start of FR-P.1 State the procedure transition

A

If RCS pressure <300# and RHR pump flow is >1000GPM then return to procedure and step in effect

20
Q

In ECA-1.1 state OAS statement for returning to procedure and step in effect

A

If Emergency Coolant Recirculation capability is restored during this procedure, further recover actions should continue with procedure and step in effect

21
Q

In ECA-1.1 state OAS page regarding FR-C.2

A

If RCPs are not running and RVLIS full range is <40% causing an Orange C. Then do not enter FR-C.2 unless increased RCS makeup flow does not restore RVLIS to >40% (after step 4)

22
Q

At the end of ECA-1.2 if the break outside containment is isolated by RCS pressure increasing state the procedure transition

A

If RCS pressure is increasing then the leak is isolated and go to E-1

23
Q

At the end of ECA-1.2 if the break is not isolated and RCS pressure is decreasing, state the procedure transition

A

If the break is not isolated by the indication of RCS pressure lowering then go to ECA-1.1 Loss of Emergency Coolant Recirculation

24
Q

State TCA for Terminating SI following an inadvertent SI

A

First CS pump stopped: 9 min
Second CS pump stopped after PZR level reaches 95%: 4 min (13 min total)

25
Q

State TCA for Terminating ECCS break flow During SGTR

A

EFW flow isolated </= 33%
Cooldown commenced after MSIV closure: 12.5 min
End of cooldown and start of depressurization: 3 min
End of first depressurization and SI termination: 5 min

26
Q

State TCA for Locally isolating a failed open ASDV

A

Transit time: 17 min
Closure time: 3 min

27
Q

State TCA for ES-1.3

A

Time to close CBS-V-2/5: 3 min
time to open RH-V-35/36: 8 min

28
Q

State TCA for ES-1.3 with single active failure

A

Time to close CBS-V-2/5 and stop RHR and CBS pump: 5 min 48 sec
Time to stop RHR and CBS pumps: 1 min
Time to stop CS and SI pumps: 11 min

29
Q

State TCA for Charcoal filter fire

A

Fan Stopped: 5 min
FB response: 20 min/ 90 min for CTB

30
Q

State TCA for responding to TB flooding

A

Time to doors: 17 min
All CW pumps tripped: 22.2 min

31
Q

State TCA for SUFP realignment from bus 4 to bus 5 and lower tap

A

75 min

32
Q

State TCA for CT boundary valve verification

A

10 min

33
Q

State TCA for SBA cabinet door being open

A

Time to initiate Att C: 20 min