Electrical System Flashcards
Possible sources of DC power include:_____?
Three generators, two 24 VDC 44 AMP batteries/external power (GPU)/HMDG
Are the R and L electrical systems normally split or tied together?
Split with a closable bus tie between the two systems.
The bus tie automatically closes on____?
external power, battery power, or single-generator
What does the AC power control?
Passenger convenience items and cabin lighting through inverters.
There are______total CB panels in the Challenger 300, located in the______?
seven;
cockpit (2), entryway (2), galley, and the aft equipment bay (2)
There are_____total CB panels in the Challenger 350, located in the_____?
eight;
cockpit (2)
entryway (2)
galley
lav (behind mirror)
aft equipment bay (2)
The acceptable GPU voltage range and amperage is____?
24-32 volts, 1,500 amps
A green switch indication AVAIL in the EXT PWR switch indicates that the_____?
GPU is connected and meets the electrical quality criteria. When at least 5 volts is sensed, AVAIL is indicated on the PBA and the electrical synoptic page displays a green GPU symbol
Individual battery voltage can be read on which two pages?
Electrical Synoptic
Summary
The generators automatically come online when____?
the engine is running after start, except when a GPU is connected
If a GPU is connected and being used, generators come online_____?
after deselecting the EXT PWR switch
When operating on a single generator on the ground,_____buses are powered, including:______?
all six; R&L essential, R&L main, and R&L aux
When operating on a single generator while in flight,______buses are powered, including:_____?
four; R&L essential, R&L main-AUX buses are load shed automatically
Auxiliary buses are automatically load shed while in flight during_____?
Single Generator and Essential Power Only operations
With a loss of all generators in flight, running on Essential Power Only, which buses remain powered?
Essential and battery