Electrical Flashcards
Location of the APU battery?
Aft equipment bay
Location of the main battery?
Nose compartment
Max engine generator load?
40 KVA
Max APU generator load?
40 KVA
Max TRU load?
120 amps
Max permissible time for ground operations with battery power only? Why?
5 minutes. To prevent ED 1 and ED 2 from overheating because the cooling fans are AC powered
How many TRUs are installed?
4
Where are the TRUs located?
Nose compartment
The main battery is rated to?
24V/17 amp hrs
The APU battery is rated to?
24V/ 43 amp hrs
How many generators are installed?
4, 2 engine generators, the APU generator, and the ADG
What is the function of the 4 TRUs?
To convert 115V AC TO 28V DC
How are the TRUs cooled?
Individual fans
Which buses are powered when the battery master switch is selected on?
Main battery direct bus, APU battery direct bus, DC direct bus
If the main buses are powered, are the essential buses automatically powered?
Yes