It is the maximum distance from an adequate airport flown in 60 minutes at the one-engine-inoperative cruise speed.
Threshold distance
What has the greatest influence on threshold distance:
(A) Speed
(B) Weight
(C) Diversion FL
A
What is the term for the point located on the aircraft’s outbound route at one-hour flying time, at the selected one-engine-out diversion speed schedule in still air and ISA conditions from the last adequate airport prior to entering the EDTO segment. It marks the beginning of the EDTO segment.
(A) EEP
(B) EXP
(C) ETP
(D) CP
A
The maximum diversion time is the maximum flying time authorized from any point of the route to the nearest EDTO adequate airport for landing. True or False.
True
What factors affect the selection of the one-engine inoperative speed:
(A) Terrain along potential diversion route
(B) The diversion fuel required
(C) The requirements associated with time limited items
(D) The overall circle size necessary to provide sufficient coverage of desired EDTO routes
(E) All of the above
E
The approved EDTO one-engine out diversion speed is a Mach/IAS speed combination selected by the operator and approved by the operational authority. For Cebu Pacific it is:
0.86M/330 KIAS
The commander has the authority to deviate from the planned one-engine-out diversion speed after assessment of the actual situation. True or False.
True
The Maximum Diversion Distance in nautical miles calculated for A330 from FCOM is:
860nm
Which of the following points in an EDTO route qualifies to be a Critical Point?
(A) EEP
(B) EXP
(C) ETP
(D) None of the above
C
The Critical Point is defined as the Equal Time Point (ETP) along the intended route of flight at which the EDTO diversion fuel requirement becomes closest to, or exceeds, the normal destination fuel plan requirements.
Which of the following points is a valid consideration for EDTO type approval?
(A) Engine thrust rating
(B) Passenger capacity
(C) Fuel capacity
(D) Cargo fire protection system
D
Which of the following is NOT applicable to the traditional or in-service method of EDTO operational approval?
(A) EDTO experience for another airplane-engine combination
(B) Operational familiarity with airplane-engine combination
(C) Maintenance familiarity with airplane-engine combination
(D) Acceptable level of propulsion system reliability of the world fleet for the airplane-engine combination.
A
Which of the following steps is valid for determining the EDTO area of operations while planning the route for an EDTO flight?
(A) Compute ETPs
(B) Determine CPs
(C) Compute estimated Critical fuel scenario using expected winds
(D) Find all the adequate airports within a defined region
D
EDTO Entry Point (EEP) is defined by:
(A) VFR airport
(B) EDTO En-route Alternate Airport
(C) Adequate airport
(D) None of the above
C
EDTO Entry Point (EEP):
(A) Shifts towards destination with headwind
(B) Shifts towards destination with tailwind
(C) Does not change due to wind
(D) Shifts towards origin with tailwind
C
AOM (Aerodrome Operating Minima) for EDTO En-route Alternate Airport being followed by Cebu Pacific is available in which of the following documents?
(A) FCOM
(B) MEL
(C) AFM
(D) OMC
D