Dwi Flashcards

1
Q

What are waste disposal options

A
  1. Landfills

2. DWI. - deep well injection

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How long has DWI bee in used? What for?

A

1990s for oil and gas

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

2 main reasons for injecting fluids into subsurface

A
  1. to increase p so recovery increases and so do profits

2. Disposal of liquid haz wastes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the 5 classes of injection and disposal wells in Alberta based on

A

The type of fluid injected

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Well use and fluid type for class 4 well

A

Use- direct injection into a reservoir (not for disposal)
Ex: SAGD

Fluid: potable or drinking water

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Use and fluid type for class 3 wells

A

Use-inject HCs, inert gas or other gases

-enhances recover (2-3 degree) and storage of fluids

Fluids: solvents(for enhanced) and sweet gas (storage)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Use and fluid of class 2 wells

A

Use: injection or disposal of produced waters (bribes)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are class 4-2 wells

A

Injection wells

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Use and fluid type for 1b

A

Disposal of: 1. Produced water specific oil field waste streams 3waste streams meeting certain criteria

(Only fluids from oil and gas)

Fluid: on list from regulations or tested against criteria

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Use and fluid for 1a

A

Use: disposal of oilfield and industrial
(Only one that accepts non oil field waste)

Fluid: list in regs but still has to be tested no matter what

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What type of well is 1a and 1b

A

Disposal wells

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Chem criteria for dwi

A
  1. pH (4.5 to 12.5)
  2. doesn’t meet surface water discharge criteria
  3. Has non-halo organic frac less then 10%
  4. Has one or more halogenated organic compounds total combined [] less then 1000 mg/kg
  5. PCB [] less then 50mg/kg
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Directive 51’s four key areas

A
  1. well bore integrity (containment of injected fluids to protect gw and conserve HC)
  2. Formations suitability for the disposal of fluids (make sure fluids are confined to zone)

3 waste stream suitability

  1. Reporting and manifest (cradle to grave)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Questions to ask about stream suitability

A
  1. Chem of waste stream compatible with disposal zone

2. Any waste management/disposal options more suitable for the disposal of these waste streams

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What do packers do?

A

Isolate the annular fluids from injection fluids

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is a more common name for long string casing?

A

Production casing

17
Q

True or false, surface casing should extend below base of all unstable gw zones

18
Q

What is the annulus between

A

Casing and tubing

19
Q

How do you get the well bore integrity

A

By testing and logging

20
Q

When do you log and test wells

A
  1. Prior to any fluids being injected
    - if requirements are not met then application is denied
  2. During life of DWI
    - to ensure hydraulic isolation
21
Q

Initial log testing requirements

A
  1. Cement top location
  2. Hydraulic isolation logging
  3. Casing integrity log
  4. Initial pressure tests
22
Q

Cement logging is for:

A
  1. Cement is used to hold the casing in place

2. To isolate various zones I.e. disposal zones or HC bearing aquifers

23
Q

Hi is for

A

Hydraulic isolation of disposal zone

E.g.temp log, radioactive tracer log, oxygen activation log or cement integrity log

24
Q

What is casing integrity log

A

Check for corrosion of casing

25
What are initial pressure tests
Up to 7000 KPA for 15 min for all class 1-4 wells. Check for leaks
26
Monitoring logging/testing requirements include:
1. Recording of annular and injection pressures 2. Hydraulic isolation logging 3. Formation pressure surveys 4. Packer isolation tests
27
Waste stream suitability
If the injection fluids may react with the aquifer matrix or the formation fluids Ex. Limestone with acid
28
Problems with dwi