Drill Sequence of Events Flashcards
For training purposes the Scene Leader shall utilize a checklist when fighting aircraft fires as simulated for training on the flight or hangar deck. (True or False)
True
Sequence of this checklist should be followed to the maximum practicable extent in combating actual fires. (True or False)
True
Is it allowable for the Scene Leader to change the sequence to fit the situation? (Yes or No)
Yes
What is the initial firefighting equipment and personnel at the scene?
a. ___________________
b. ___________________
c. ___________________
d. ___________________
a. MFFV(s)
b. Scene Leader
c. Hose Team Leaders
d. Four manned AFFF Hoses
On the Scene Leader’s check-list what is the “2nd” step performed?
Nozzles on - Move in
Personnel shall step ______ all firefighting hoses to avoid personal injury.
Over
The Scene Leader should back out the P-25 as soon as practical to maximize the range of the hose teams and to reduce noise for commands between himself and the Hose Team Leaders. (True or False)
True
If weapons are exposed to fire, can the Scene Leader report “Fire Under Control” without weapons cooling
in progress? (Yes or No)
No
When there are dedicated hoses in place for weapons cooling the clock may start for weapons cooling. (True
or False)
True
What device can be used to determine surface temperatures of weapons, so to continue or discontinue weapons
cooling?
Thermal Imager Camera (TIC)
During Thermal Imager Camera (TIC) readings, weapons cooling can still be applied to weapons while taking readings. (True or False)
False
For overhaul to be complete what should be removed and disconnected?
LOX removed and batteries disconnected
When setting the reflash watch how many Hose Teams are needed?
One
With squadron maintenance personnel present, scene leader turns over the scene to Crash and Salvage, and
commence salvage operations. (True or False)
True
Before a “Ready Deck” can be declared, what must be conducted?
FOD Wald-down