Design Phase Criteria Flashcards
If consultants are being used, during which phase of design would you involve them in the project?
programming/pre-design
The overall code compliance process for the project begins when?
Before completion of the rough space plan
To minimize conflicts in the contract documents, what is the LEAST important action the interior designer can take?
Show only dimensions on the drawings.
Write the specifications after the drawings are essentially complete.
Make sure terminology in the specifications is the same as in the drawings.
Have someone check the drawings before they are issued.
Write the specifications after the drawings are essentially complete.
The specifications should be outlined and begun while the drawings are being done. The specifications writer and the job captain should be in constant contact and coordination while both documents are being completed, to minimize conflicts.
During what design phase would the designer coordinate the design with building systems and review all consultant work to ensure that the code requirements continued to be satisfied as the design developed?
schematic
An important part of the schematic design phase of a project is coordinating the work of consultants, integrating the design solution with the applicable building systems, and ensuring all the requirements of codes and regulations are met.
The interior designer is about to contact and coordinate with utilities, governmental agencies and other regulatory bodies as required which phase of design are they currently working in?
programming and pre design
During the Programming and Pre Design phases of design the interior designer first researches, contacts, and coordinates with utilities, governmental agencies and other regulatory bodies as required.
What interior design service is normally performed during the contract document phase of a project?
prepare furniture drawings
review shop drawings
perform code review
coordinate the consultant contracts
prepare furniture drawings