(D23) and (D19) Page. 33 Flashcards
What listing does the FSC use to monitor Due-In-From-Maintenance (DIFM) status and maintain visibility of issued assets controlled by maintenance within the repair cycle process?
Repair Cycle Asset Management Listing (D23)
What critical information is found on the DIFM?
- DIFM status
- DIFM location
- DIFM days (number of days issued)
- Percentage of base repair (PBR)
This indicates the estimated percentage of time an XD/XF item is repaired at the base level
Percentage of Base Repair (PBR)
Within how many days from the date of issue a DIFM not inducted into maintenance repair must be returned to the LRS/Materiel Management Activity?
Within 4 days
Base reparable assets assigned to back shops will be returned by the end of what?
End of the 45th duty day
When a reparable asset is awaiting the bits and pieces needed for repair is called?
Awaiting Process
What are replacement parts called?
Bits and Pieces
When a reparable asset is awaiting the bits and pieces needed for repair, it is called what?
Awaiting parts (AWP)
The due-out detail records will be placed on the D19, this list contains what?
All AWP due-out detail records with linked due-in and status for the AWP end item
The D19 lists the assets in AWP status, and should ______ the D23 listing to repair the DIFM asset.
Match
What ensure monitors maintain a good repair cycle program?
D23 and D19