Cycle 2 Flashcards
True or False?
In the city buildings over the size of 75 feet exist that do not possess a standpipe
Cycle 2 (Dry Stretch/Hose Folding & Packing)
True
Buildings built on a grade commonly get nine stories high with no standpipe
Cycle 2 (Dry Stretch/Hose Folding & Packing)
In NFMD where should the third line be stretch via?
Cycle 2 (Dry Stretch/Hose Folding & Packing)
The Fire Escape or a Rope Stretch
Cycle 2 (Dry Stretch/Hose Folding & Packing)
What are tell tale signs of an arsonist?
Cycle 2 (Dry Stretch/Hose Folding & Packing)
Wet or Stained ceillings or floors, plastic bottles, balloons, streamers
Cycle 2 (Dry Stretch/Hose Folding & Packing)
In a NFMD cellar fire, where is the 2nd line located?
Cycle 2 (Dry Stretch/Hose Folding & Packing)
Top of the interior stairs
Cycle 2 (Dry Stretch/Hose Folding & Packing)
True or False?
When an OLT has a front fire escape,
it usually indicates three or four apartments per floor?
Cycle 2 (Dry Stretch/Hose Folding & Packing)
False
(Front fire escape and four windows per floor)
Cycle 2 (Dry Stretch/Hose Folding & Packing)
The preferred ladder for placing over weakened, damaged or burnt-out stairs is?
Cycle 2 (Dry Stretch/Hose Folding & Packing)
Extension Ladder
Cycle 2 (Dry Stretch/Hose Folding & Packing)
What is a risk with air shafts?
Cycle 2 (Dry Stretch/Hose Folding & Packing)
Auto-Exposure
Cycle 2 (Dry Stretch/Hose Folding & Packing)
What are transevrse stairs?
Cycle 2 (Dry Stretch/Hose Folding & Packing)
Stairs that access the entire building
Cycle 2 (Dry Stretch/Hose Folding & Packing)
In the FDNY, what is considered the first floor?
Cycle 2 (Dry Stretch/Hose Folding & Packing)
The Ground Floor
Cycle 2 (Dry Stretch/Hose Folding & Packing)
In OLT store fire, what does the first ladder do?
Cycle 2 (Dry Stretch/Hose Folding & Packing)
Force entry into the store, check rear for extension into OLT and open ceiling and voids
Cycle 2 (Dry Stretch/Hose Folding & Packing)
In an OLT store fire, what does the second ladder company do?
Cycle 2 (Dry Stretch/Hose Folding & Packing)
Floor above forcible entry and search for life and extension.
Cycle 2 (Dry Stretch/Hose Folding & Packing)
What type of material is the ceiling of a OLT cellar?
Cycle 2 (Dry Stretch/Hose Folding & Packing)
Concrete
Cycle 2 (Dry Stretch/Hose Folding & Packing)
When needing to cut a hole in the roof, what is the prefered technique
Cycle 2 (Dry Stretch/Hose Folding & Packing)
3’ x 6’ Coffin Cut
Cycle 2 (Dry Stretch/Hose Folding & Packing)
What is a defensive technique from the roof to stop the spread of a fire in the cockloft?
Cycle 2 (Dry Stretch/Hose Folding & Packing)
Trench Cut
Cycle 2 (Dry Stretch/Hose Folding & Packing)
When is the trench cut pulled?
Cycle 2 (Dry Stretch/Hose Folding & Packing)
When fire reaches the inspection holes
Cycle 2 (Dry Stretch/Hose Folding & Packing)
How wide does a trench cut need to be effective?
Cycle 2 (Dry Stretch/Hose Folding & Packing)
3’ wide
Cycle 2 (Dry Stretch/Hose Folding & Packing)
When cutting a trench, what does one make sure not to prevent?
Cycle 2 (Dry Stretch/Hose Folding & Packing)
Cutting off access to their escape
Cycle 2 (Dry Stretch/Hose Folding & Packing)
Which hydrant possess a bonnet?
Cycle 2 (Dry Stretch/Hose Folding & Packing)
Smith
Cycle 2 (Dry Stretch/Hose Folding & Packing)