Cratering Flashcards
To be effective craters must be ____
Too wide for track vehicles to span and too steep sided for vehicles to pass
Craters are considered effective if
it takes 4 or more passes for tracked vehicles to pass
Hasty crater hole depth
5 feet deep
Hasty crater explosives per hole
50 lbs per hole
Hasty crater borehole spacing
5 feet center to center, stem after packing
Hasty crater blowout
8 feet
Hasty crater characteristics
V shaped about 6 to 7 feet deep and 20 to 25 feet wide.
Side slope of 25 to 35 degrees
Hasty crater formula
N = (L-16)/5 + 1
Round up number of holes to next higher number
Deliberate crater borehole depths
5 and 7 feet
Deliberate crater explosive weights
5’ holes have 40 lbs
7’ holes have 80 lbs
Deliberate crater bore spacing
5 ft center to center
Deliberate crater borehole rules
End boreholes are 7’ deep, no two 5’ holes next to each other
Deliberate crater characteristics
V shaped approximately 7 to 8’ deep
25 to 30’ wide with 37 degree slope
Modern tanks require 8 attempts
Deliberate crater blowout
8’
Deliberate crater formula
N = (L-16)/5 + 1
Round up to next highest number
Relieved face crater borehole depth
Friendly side 5 feet deep
Enemy side 4 feet deep
Relieved face crater explosive weights
5 feet deep, 40 lbs
4 feet deep, 30 lbs
Relieved face crater priming
Prime rows separately with 1/2 to 1.5 second delay. Fire enemy row first
Relieved face crater borehole and row spacing
7 feet center to center between boreholes.
8 feet between rows on dirt or gravel roads
12 feet between rows on hard surface
Relieved face crater blowout
5’
Relieved face crater characteristics
Trapezoidal shaped
7 to 8 feet deep
25 to 30 feet wide with unequal slopes
Relieved face crater formula
N = (L-10)/7 + 1
Round up to next highest whole number
Gives friendly side
Subtract one for enemy side
Expedient breaching of a hard surface
Use 1 lb of explosive per 2” of pavement. Tamp 2x breaching radius
Expedient cratering charge mixture
Ammonium nitrate fertilizer and fuel/oil