COST allocation Flashcards
1
Q
The basis that is used to allocate costs to cost objects (i.e. the number of material receipts in our
example) is called an allocation base or cost driver.
A
Where allocation bases are significant determinants of costs the terms
cause-and-effect allocations or driver tracing are used
2
Q
Where a cost allocation base is used that is
not a significant determinant of its cost, the term arbitrary allocation is used
A
3
Q
A
4
Q
A
5
Q
A