Containment Structure Flashcards

1
Q

Difference between sleeved and unsleeved penitratiins

A

Sleeved penetrations are designed for multiple pipes or single pipes that carry fluid >150F. Unsleeved penetrations are designed for single pipes that carry cold fluids <150F.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What temperature requires containment integrity to be set?

A

Set whenever reactor coolant temperature exceeds 200F.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Describe the emergency escape manway.

A

It is an 18” manually operated hatch on the lower center of the interior door with a double set of O-Rings and test connections to check for leakage

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How do you check the double O-Ring seals for leakage.

A

Pressurizing the space between them and performing a drop / flow test.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What operates the lock pin on the inner and outer door.

A

Containment IA supply’s air to operate the inner door lock pin.

Service IA provides air to operate the outer door lock pin.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Containment liner and wall thicknesses?

A

Foundation Mat: .25” steel 10ft concrete
CTMT wall: .375” steel 4.5’ concrete
CTMT dome: .5” steel 2.5’ concrete

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Boundaries of fission product release

A

Containment
RCS
Fuel cladding

How well did you know this?
1
Not at all
2
3
4
5
Perfectly