Construction Technology Flashcards

1
Q

What is the optimal wall :floor ratio?

A

0.3-0.5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Can you name different types of piles?

A

Driven
Bored
Secant
Contiguous
CFA Pile
Sheet Pile

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What’s the difference between a green roof and blue roof?

A

Green roof comprises of shrubs/vegetation to alleviate runoff water

Blue roof stores the water in a cavity and gradually releases water through drainage system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are advantages of a blue roof?

A

Keeps buildings cool
Alleviates run-off water slowing down drainage
Prevents floods

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are advantages of a green roof?

A

Keeps buildings cool
Alleviates run-off water slowing down drainage
Prevents floods
Aesthically pleasing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the benefits of a SFS system over blockwork?

A

Cost: quicker to install, lightweight, programmer benefits, less prelims with plant and labour

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How much is SFS?

A

Approx. £120/sqm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How much is blockwork wall?

A

Approx. £180/sqm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What’s typical net :gross?

A

0.7-0.8

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What are different types of bridge?

A

Viaduct
Cantilever
Truss

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Name 3 types of brick bonding and what’s the most expensive and why?

A

Stretcher bond
English Bond
Soldier Course
Flemish Bond

Soldier course due to additional work cutting brick, and intricate design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How do you price piling?

A

Excavation (m3)
Pile (m3)
Pile Mat (nr)
Pile rig (nr)
Pile Cap (m2)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the basement waterproofing grades

A

Grade 1 – 4
Grade 1 (basic utility) – Car park
Grade 2 (better utility) – plant room
Grade 3 (habitable) - resi or commercial space
Grade 4 (habitable) – Offices, restaurants, leisure centre, laboratory

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What are the advantages and disadvantages of secant pile

A

Advantages:
Can be used where water retention required
Strong/robust foundation

Disadvantages:
Expensive
Not 100% waterproof

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is MVHR?

A

Mechanical Ventilation Heating Recovery

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is the difference between air source heat pumps and Combined Heat and Power (CHP) unit ?

A

Air Source heat pump uses outside air to produce heat and cooling whereas Combined heat and power unit also produces electricity.

17
Q

Name three changes to building regulations that have come in the last 3 years that impact residential projects

A

Part L – conversation of fuel
Part O – Overheating
Building Safety Act 2024

18
Q

What are the different forms of MMC?

A

Bathroom Pods
Pre-cast concrete
3D printing

19
Q

Can you describe the difference between a secant pile and contiguous pile?

A

Contiguous sit side by side, Secant Piles have primary and secondary (soft & hard pile) which overlap one and other with the hard pile comprising reinforcement whereas soft pile is simply concrete

20
Q

How would you get a Contractor to price the brickwork?

A

On a £/sqm basis, prime cost or Cost/1000 bricks

21
Q

What is a PC Sum?

A

Allowance for material only to be included in a Contract Sum i.e., carpet at £/sqm and can be instructed against once specification confirmed

22
Q

What factors affect the cost of the façade

A

Size, shape, design of the building, particularly height, material, labour (specialist), location, any particular requirements