Concrete Flashcards

1
Q

Is the process of measuring concrete mix ingredients by either mass or volume and introducing them into the mixture.

A

Batching

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Most specs require batching be done by

A

Mass rather than by volume

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Concrete is sometimes mixed at the job site in a

A

Stationary mixer or paving mixer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Many specs require a minimum mixing time of

A

1 minute plus 15 seconds for every cubic meter (yard)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Wood forms, unless oiled or otherwise treated with a form-release agent, should be moistened before placing concrete, otherwise they will

A

absorb water from the concrete and swell.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

However, if a _________ is not used to control the flow of concrete onto sloped surfaces at the end of an inclined chute, segregation can occur.

A

Baffle

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The diameter of the tremie pipe should be at least ____ times the diameter of the maximum size of aggregate.

A

8

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

__________________________ makes easy work of placing concrete underwater.

A

Mobile concrete pumps with a variable radius boom

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

_________________ is the process of compacting fresh concrete; to mold it within the forms and around embedded items and reinforcement; and to eliminate stone pockets, honey- comb, and entrapped air

A

Consolidation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

___________ is the process of cutting off excess concrete to bring the top surface of a slab to proper grade.

A

Screeding or strikeoff

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

To eliminate high and low spots and to embed large aggregate particles, a _________________ should be used immediately after strikeoff.

A

Bull Float or Darby

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

___________ must be completed before bleed water accumulates on the surface.

A

Bull floating or darbying

How well did you know this?
1
Not at all
2
3
4
5
Perfectly