Competency Case Studies Flashcards
1
Q
‘…Improving the EPC of a Warehouse in Tottenham.’ - Ethics, rules of conduct and professionalism
A
White Hart Lane - SEGRO
2
Q
Client Care - Unit 7 Leatherhead Dilapidations
A
- Contractual claim: £160K
- Estimated settlement: £85K
- Items that contentious / considered may fall away: Carpets were bespoke but in good condition (£7K), asbestos roof cleaning works (£9K), schedule of condition (£15K).
- Negotiation details: Issued priced specification and updated the Scott schedule with tendered costs to show what works were to be done. Tenant elected to strip out warehouse mezzanine.
3
Q
Client Care - Unit 7 Leatherhead Dilapidations
A
Items omitted from the schedule:
- Decoration and repair works to the portion of the ancillary accommodation block that was the be demolished by the landlord.
- Decoration to the roller shutter door - was to be replaced with insulated sectional door.
- Cleaning of the asbestos roof - was to be oversheeted.