Project Design or SoW (Scope of Work)

A

Design development
Specifications
Work Drawings
Network Types

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Common Design Mistakes

A

Accuracy of clients’ drawings
Calculation errors
Use of existing infrastructure
Material packing mistakes
Correct sizing of components
MH Sizing
Cable Sizing
Poles
Conduits
Termination Space
Incorrect Equipment
Compatibility Issues
Site Survey
The technical ability of the designer
Security of materials on site
Document Control
Termination Locations
Service and Storage Loops
Environmental Issues

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

SoW (Scope of Work)

A

Title
General Statement
Objective
Performance Requirements
Specific Tasks
Document Deliverables
Qualification Requirements
Quality Control
Place and period of performance
Construction management
Restrictions and constraints
Security clearance requirements
Contracting Representation
Attachments
Assumptions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

GIS OSP Checklist

A

Proposal and Conceptual Design
Construction ride out
Design environment
Permitting
Make Ready
Print Automation
Construction
Deliverables
Q&M
Certification

How well did you know this?