Owners set bidder requirements in the

A. Advertisement to bid
B. Invitation to bid
C. Prequalification of bidders
D. Prebid conference

A

C. Prequalification of bidders

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

During construction, a client requests that a door be added to a partition. Given that the client agrees to the cost of adding the door, the interior designer administering the associated contract should issue a(n)

A. Addendum
B. Construction change directive
C. Change order
D. Work directive

A

C. Change order

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What fabric would have the BEST appearance for the longest time when used in theater seating?

A. Vinyl
B. Wool-nylon blend
C. Acrylic-acetate blend
D. Cotton-rayon blend

A

B. Wool-nylon blend

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

When specifying a specialty flooring material, the interior designer can obtain unbiased information on the hazards of a cleaning agent required for maintenance from the

A. Cleaning agent manufacturer
B. Environmental protection agency (EPA)
C. Flooring manufacturer
D. Safety data sheets

A

D. Safety data sheets

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Requirements for vertical louver blinds would be found in which part of the CSI MasterFormat outline?

A. Division 07
B. Division 09
C. Division 10
D. Division 12

A

D. Division 12

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

An interior designer Is planning a set of interior construction drawings for a client leasing office space in a very large building. The entire building cannot be shown on a single drawing sheet at the required scale. The designer should place the key plan on

A. The title sheet
B. The first sheet of the construction floor plans
C. Each sheet of construction plans
D. Each sheet that includes a plan view

A

D. Each sheet that includes a plan view

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What type of specification does the following excerpt represent?

PART 2 PRODUCTS

2.01 Materials

Paints shall be as manufactured by ICI Dulux Paints. Colors, types, and sheens shall be as listed on the finish legend on the drawings. Formulation of primer and finish coasts shall be selected by the painting contractor based on the type of substrate being covered and the specified sheen.

Paints shall comply with applicable federal, state, and local laws enacted to insure compliance with Federal Clean Air Standards and shall conform to the restrictions of the local air pollution control authority.

A. Descriptive
B. Or equal
C. Performance
D. Proprietary

A

D. Proprietary

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

A description of required procedures for the installation of individual materials or products in a specification book would be found in

A. CSI MasterFormat Division 01
B. Part I of each technical section
C. Part II of each technical section
D. Part III of each technical section

A

D. Part III of each technical section

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

A window covering that is made from fabric and is generally not intended to be opened is called

A. A curtain
B. An Austrian shade
C. A vertical blind
D. Drapery

A

A. A curtain

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

An interior designer is selecting luminaries and lamp sources to illuminate the waiting area of a medical clinic for which the furniture and finishes have been selected. In order to maintain the most accurate color rendition of the furniture and finishes, what is the best approach for selecting the lamps?

A. Select those with the highest color rendering index (CRI)
B. Analyze the correlated color temperature (CCT) of the lamps
C. Review the spectral energy distribution curves
D. New the samples under each lamp being considered

A

D. New the samples under each lamp being considered