Chapter 12 - Outside Plant Flashcards
The ICT distribution designer should design conduits entering from:
- Basement wall to terminate ~ ___ in from the finished wall
- Below grade point to extend ~ ___ above finished floor (AFF)
- Ceiling height to terminate ~ ____ below the finished ceiling
4 inches for these cases
Note: 4in penetration is specified for EFs, as opposed to the 1” to 3” penetration specified for intrabuilding conduit
The penetration specified for intrabuilding conduit is:
1in to 3in
What are the three locating methods?
- Electronic :signal or tone is placed on utility and receiver detects signal and locates utility based on strength and distribution of radiated field
- Water vacuum: If several layers of utilities are possible, and adequate identification is questionable this is used. Uses a special truck that uses high pressure water spray-vacuum. Also known as soft digging. System will excavate a small 6in wide hole to the desired spots along the routes
- Air vacuum: sends high pressure supersonic air streams into porous soil. Does not damage utilities due to their impermeability. Hole has diameter of 6in to 10in and go go several feet vertically. Another method of soft digging.
A ___ interface is the connection between the access provider (AP) and a private network within a building.
Network interface
What are the BICSI recommended wall length for terminating space for telecommunications entrance facilities serving up to the following gross floor spaces?
10,000 sq ft 20,000 sq ft 40,000 sq ft 50,000 sq ft 60,000 sq ft 80,000 sq ft 100,000 sq ft
10,000 sq ft = 39ft 20,000 sq ft = 42ft 40,000 sq ft = 68ft 50,000 sq ft = 90 ft 60,000 sq ft = 95ft 80,000 sq ft = 120ft 100,000 sq ft = 144ft
All hardware in manholes must be galvanized. MHs should be equipped with:
- sump pump of at least 13in diameter
- pulling eyes of at least 0.875in diameter
- bonding and grounding provisions
- entry ladder (where feasible)
The count level of service diversity assigns circuits:
among different binder groups or fiber tubes within one cable
The sheath or cable level of service diversity assign circuits:
among different sheaths or cables
The route level of service diversity assigns circuits:
among entirely different cable paths to a building
The backbone level of service diversity assign circuits:
among different intrabuilding backbone and cabling
If a maintenance hole (MH) is longer than ____, it should be equipped with three covers.
20ft
Use 2 covers if between 12ft and 20ft
What is the minimum separation between communications conduit and direct buried power or other foreign conduit?
- Of concrete?
- of masonry?
- of well-tamped earth?
3in of concrete
4 in of masonry
12in of well-tamped earth
What is the minimum separation between direct buried telecommunications conduit and pipes (gas, oil, water)?
6 in when crossing
12 in when parallel
What is the minimum separation between direct buried telecommunications conduit and street railways?
3.28ft below top of rail
What is the minimum separation of direct buried telecommunications conduit and railroads?
50in below top of rail