Chapter 111 Flashcards
When supply pressure is inadequate for upper floors, and when the maximum building demand for water is always less than the maximum flow available from a municipal or local distribution system, which of the following systems can be used?
A) tankless constant pressure
B) constant pressure system with a suction tank
C) direct pressure system
D) constant pressure system with a pneumatic tank
A) tankless constant pressure
The pressure in the building plumbing system should not drop below \_\_\_\_ at any location. A) 150 kPa (20 psi) B) 175 kPa (25 psi) C) 250 kPa (35 psi) D) 300 kPa (42 psi)
B) 175 kPa (25 psi)
Temperature relief devices are effective in eliminating:
A) scale build-up in the system
B) flashing of water into steam when faucets are opened
C) venting off air released from water during heating
D) inadequate heating of the water
B) flashing of water into steam when faucets are opened
An air gap is a \_\_\_\_ between the free flowing discharge end of a potable water pipe and an open or non-pressure receiving vessel such as a sink or bathtub. A) siphon B) physical separation C) vent D) low point
B) physical separation
Fusible plugs are made of materials that melt at a temperature of: A) 150*C (300*F) B) 125*C (260*F) C) 225*C (440*F) D) 99*C (210*F)
D) 99C (210F)