Ch. 20 * (OSP) Flashcards

0
Q

Count

A

Binder groups

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

Underground pathways

A

Use conduit

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Route

A

Path

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

OSP must be transitioned to indoor within ___ of bldg entrance

A

49’

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

BICSI recommendations for underground entrance conduits

A

(4) 4” + spare 4” & (3) 2”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Underground conduit minimum cover

A

24”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

5’ deep trench

A

Shored to prevent cave-in

Dirt pile - 2’ away

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Entrance wall sleeve

A

0.25” slope

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Pedestals serving single-story buildings should be installed within ___ of each tenant space?

A

150’

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Trench depth in cold-weather regions

A

Below 50 year frost line

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Railroad track conduit placement

A

25’

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Vibratory plow

A

Cuts the ground like an electric knife

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Maintenance hole guidelines

A

12-20’ = two covers

Over 20’ = three covers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Identifying covers

A

T - telephone
S - signal
TV - CCTV / CATV

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Concrete strength for mntc holes

A

3480 psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Suspension strand/cable should be placed on ___ of pole line

A

Roadside

16
Q

Range of pole strength rating

A

00 (strongest) - 10 (weakest)

17
Q

Three types of pole loading

A

Transverse storm
Vertical
Bending

18
Q

Outside Plant Telecommunications standard

A

758-A

19
Q

Joint trench method: minimum vertical/horizontal separation between telecommunications facilities and street rail should be 3.3 feet ___

A

Below top of rail

20
Q

Joint trench method: minimum vertical/horizontal separation between telecommunications and power should be ___ if will tamped earth

A

12”

21
Q

Routing OSP cable in a building is influenced by ___

A

Fire code

22
Q

Wall length required for 10,000 sq’

A

39”

23
Q

Joint trench method: minimum vertical/horizontal separation between telecommunications and gas =

A

6”