Ch. 10 Flashcards

1
Q

Standard data

A

a catlog of time standards developed from a database of collected standards over years of time studies

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Advantages of SD

A

Is shorter than PTs. more accurate. can be set before production starts

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

most common SD formula

A

linear slope

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Constant cyle times

A

mechanical punch press, time 10 actions, takes average

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Feed rate what is it and formula

A

like welding. measures the distance traveled per revolution turning. inches per revolution.
Length of cut/ number of revolutions required.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

basis of machine run time

A

speeds and feeds

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Time standards consits of

A

Machine time and load/unload time.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

speed measured in

A

distance traveled per minute.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Number of revolutions formula

A

lenght of cut/feed rate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Balanchign techique is used for

A

Equalizign the workload between operators, work stations. identify the bottleneck operation. Establishing speed of assembly time. Determine number of work stations. determine labor costs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

R value

A

the rate at which a part must be produced in order to meet customer demand. b

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

production rate with cycle time

A

conversions rate for time x however many lines or operators / Cycle time

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

machines required for fabrication operations

A

you add up all the partial machines, round up, and purchase that many.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Lead time

A

the time it takes for a product to made from start of production to the assembly.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

purpose of assembly line balancing

A

same as the balancing technique but in addition helps with plant layout and reduces production costs. most important is to make sure that two operators are given the same amount of work for each value.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

theoractely

A
17
Q

assembly line balance

A

used to calculate the production rate

18
Q

Efficencly

A

Earned time/ actual time

19
Q

Manpower required

A

Cycled time/ actual time.

20
Q

Yamazumi chart

A

chart to establish lien balancing

21
Q

Conveyor speed

A

a combination of product size and cycle time. parts/min x ft/part

22
Q

For machines required in fabrication machines? for Assembly lines

A

Add up all the partial machines, round up, and get that many. Round up immediately.

23
Q

Rpm formula

A

Speed rate/pi x D.

24
Q

Standard data is measured in blank elements

A

full elements as compared to methods such as MODAPTS which use standard data.