described as the act of an employee of informing the public or higher management of unethical or illegal behavior by an employer or supervisor.
Whistle blowing
chairman of the CPD council is
a member of the Professional Regulatory Board/Board of Civil Engineering
known as the Continuing Professional Development Act of 2016.
RA 10912
results from team effort and measured by the degree of satisfaction of all parties involved.
Quality
situation in which companies share information illegally among themselves when offering to supply goods or services, in order to control the price.
Collusive Tendering
known as the Civil Engineering Law.
544
two-envelope system of selection procedure consists of the technical proposal and what?
price proposal
Gaining some unfair or dishonest advantage through deception and trickery is the unethical practice of
fraud
CPD Units required for the Civil Engineering Profession
45 Credit Units
A Civil Engineer can terminate an Agreement if there is no payment made within how many days after the due date without contention.
30 days
Practitioners of “maestro de obras” can undertake the making of plans supervision for buildings of how many floors
not more than 2
The subjects for examination in the CE Board Exam
Mathematics, Hydraulics, Geotechnical Engineering, Structural Design and Construction
failure to exercise that degree of care which, in the circumstances, the law requires for the protection of those interests of other persons which may be injuriously affected by the want of such care.
Negligence
In the computation of the total project cost, what is added to cover for the uncertainties in the project.
contingency allowance
is the offering of some good, service or money to an appropriate person for the purpose of securing a privileged and favorable consideration (or purchase) of one’s product or corporate project.
bribery
can engage in civil engineering practice when acting under the supervision of their employer.
draftsmen
The professional practice of foreign civil engineers are allowed by law under what Republic Act
RA 8981
refers to the analysis of matters of right and wrong.
ethics
are exempted from registration as a civil engineer.
Officers or enlisted men of the United States and Philippine Armed Forces, and civilian employees of the Government of the United States stationed in the Philippines
Civil engineers or experts called in by the Philippine Government for consultation, or specific design and construction of fixed structures
When the Civil Engineer assumes overall coordination including architectural and other engineering services, the Engineer is what
prime professional
The percentage fee for construction services shall not exceed
10%
During design services, this is the phase wherein we analyze the needs of the clients, provide conceptual design, and conceptual opinions of the probable construction cost.
Study and Report Phase
The Civil Engineer serving as a prime professional for a 3 – storey building with a project construction cost of Php 9,000,000, his minimum basic fee would be?
Php 630,000
As common practice, the allowance for uncertainties upon the completion of study and report phase is around how many %
20%
Upon the completion of the final designs, the allowance for uncertainties added to the total project cost would be around
10%
You are employed as a civil engineer in a private company, XYZ Build. A two-storey commercial building was assigned to you to be designed. After the design phase, you are also asked by your supervisor to sign and seal the plans and specifications on behalf of the company. You happily obliged the request. Is there any additional compensation for this act?
Yes, a minimum of 10% above and beyond the basic salary.
This is the phase where we prepare the final design criteria and outline specifications of the project when we provide design services.
Preliminary Design Phase
A design service phase where we prepare the design calculations, construction drawings and specifications, and other contract documents.
Final Design Phase
A civil engineer was asked to perform feasibility study of an apartment project, his fees would be a maximum of
3% of the construction cost
During this phase in our design service, we provide assistance to the client in the start-up and the processes of the project, and also provide inspections periodically.
Operation Phase
A basic Engineering Design Services was required of the Civil Engineer in a resort project which has a construction cost of Php 8,000,000, her minimum compensation for her services would be?
Php 84,000
Order of QBS
Invitation or Public Notice
Budget Preparation
Evaluation of Qualifications
Pre-proposal Conference
Proposal Evaluation / Interview
Background Check
Shortlisting
Awarding of Winning Bidder
Negotiation
Contract Signing
What Canon: Civil Engineers shall hold paramount the safety,
health and welfare of the public and shall strive to
comply with the principles of sustainable
development in the performance of their duties.
Canon 1
What Canon: Civil Engineers shall perform services only in areas of
their competence.
Canon 2
What Canon: Civil Engineers shall issue public statements only in
an objective and truthful manner.
Canon 3
What Canon: Civil Engineers shall act in professional matters for
each employer or client as faithful agents or trustees
and shall avoid conflicts of interest.
Canon 4
What Canon: Civil Engineers shall build their professional
reputation on the merit of their services and shall not
compete unfairly with others
Canon 5
What Canon: Civil Engineers shall act in such a manner as to
uphold and enhance the honor, integrity, and dignity
of the civil engineering profession.
Canon 6
What Canon: Civil Engineers shall continue their professional
development throughout their careers, and shall
provide opportunities for the professional
development of those civil engineers under their
supervision.
Canon 7
On your daily site tour, you walk by a steamfitter and you notice he smells of alcohol. The appropriate thing for you to do as superintendent is
Remove the worker from the jobsite immediately, contact his foreman, and have a drug/alcohol test conducted
Having a successful career, you have retired and sworn off construction forever. With the money from the gigantic retirement fund you have, you decide to build a house. Four contractors submit a bid, one who is a cousin of your spouse. You should hire
Hire the contractor that offers the best value to you
Hiring is your primary job for your new company. You need to hire a new field engineer within the next week. You look at the demographics of the company and realize that only 3% of the company are African Americans. When you hire someone you
Hire the most qualified and suitable person for the job
Being the site supervisor, you are walking around your project site. You notice oil spilled into the soil from the mason’s mixing machine. The mason foreman says that grade level will be five feet higher and no one will ever see it. What should you do?
Make the subcontractor remove the contaminated soil and replace it with new soil
The current outlook for your project is Php 300,000 over budget and you are looking for ways to trim budget. Your purchasing landscaping and the lowest bid came exactly what you have budgeted for. What is the most ethical action you can take to benefit everyone
Contact all subcontractors and tell them all bids were too high and that an online auction for the contract will take place