CBRNDC Flashcards
What is an SPE, how many types are there and how long do they last?
Stored pressurised extinguisher
AFFF - 38 seconds
Co2 - 9 seconds
Dry powder - 15 seconds
Wet chemical (fry fighter) - 45 seconds
How long does an AFFF drum last
90 seconds delta nozzle
4 minutes CFHR
What AFFF fixed sprays do we have, what spaces do they cover and where are the ROVs
Where are the AFFF tanks and what percentages do they hold
X2 hanger 1% covers hanger
X1 halon store 1g, covers all main spaces
X1 naafi store, covers AVCAT
What is a SCEF, how many do we have, where are they and where are the starters
Smoke clearance exhaust fan
- fan in ATU6, starter in airlock 1C
- fan in 01F, starter local
- fan in 1G, starter by UAMR access
- fan in 1K, starter 01J lobby
- fan in 01K hanger, starter 1k lobby
Where are all the salvage eductors and remote operation positions
PUMPING RATE 75m3 hour
CWPR stbd 2E/1E
FAMR stbd 2H/1E airlock
FAMR port 2F/1E airlock
GTR stbd 2G/1G workshop
GTR port 2G/1G workshop
MGR stbd 2H/1G
MGR port 2H/1G
Where are all the routine eductors
PUMPING RATE 15m3 hour
3A gunner store
3C sonar space
3D PO cabin flat
4J STP
5K AVCAT port/stbd/middle
3L no.1 naval stores
3M winch well
3N tiller flat
Where are the drain down valves for the UAMR to MGR
Workshop
AFT SWBD
How many WEDA pumps do we have onboard, where are they and what are the pumping rates
PUMPING RATE 100m3 hour
2x FWD FRPP
2x AFT FRPP
x1 1g
x1