what agency issues a sewage disposal permit
BC health authority (Provincial)
who is qualified to issue and take out a electrical permit
the BC safety authority (provincial) and qualified electrical contractor
what do the 2-5-10 warranty cover
2 - labor and materials
5 - building envelope
10- building structure defects
what level of government develops by laws
municipalities and regional districts
what is the purpose of a building bylaw
to make sure the builder is following the requirements of the municipality
what are the requirements for a building permit
2 or more sets of drawings, sewage , source of potable water
what are 2 types of forms that the inspector checks for rebar
(ICF) and concrete block
what is required prior to a framing inspection ?
survey certificate , engineered materials , mechanical rough ins
what must the moisture content be at the time of framing inspection
19% or less
for factory built chimneys what does the building inspector check for
ULC certification
at concrete form inspection what does the building inspector check for
solid bearing , absence of both organics and standing water
what is inspected prior to back filling
perimeter drainage ,
damp and waterproofing the foundation
When applying for a building permit which of the following must an owner or contractor submit with the application
Plans and specifications
Can you repair plumbing without a permit
No
Who makes the final inspection
Building inspector