Book 100 ICS HI-RISE Flashcards
If an auxiliary water supply is required, the ___________ supervisor will coordinate and supervised this function.
Ground Support Group
_____ may be established by available engineers from the first alarm assignment.
BASE
How many companies are assigned for reported high rise fire?
5 companies
- 3 engines
- 2 trucks
- ALS
- BLS
- EMS
- BC
What’s the primary responsibility of the First in Company?
Locate and identify the emergency and determine its scope.
Companies ascending stairwell to reported fire will check ___ floors below fire floor/
2 floors
What is the responsibilities of the second in company?
They establish lobby control
What is lobby control responsible for?
- Elevators
- Vertical Access
- Communication Systems
- Air handling
- PSI of stairwells
What does ALSB mean?
Attack
Lobby
Staging
Base
AIR OPS -
How far should helicopters remain from involved building?
1/2 mile
Elevators can be used if above the __ floor and stop __ floors below the fire for staging.
6 floors
Stop 2 floors
What are the 2 types of high rise buildings?
Commercial and residential