Board- Engineering Flashcards

1
Q

Cheng

A

Chief engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

MPA

A

Main propulsion assistant

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

EOOW

A

Engineering officer of the watch

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Space supervisor

A

Responsible for overall plant control, signs and reviews logs in engineering plant and shaft alleys

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Boiler Console Operator

A

Top Boiler Technician watch in space. Responsible for operating the boiler console, and monitoring burners and stack condition. Orders burner man to light and extinguish burners.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

EPCP

A

Responsible for monitoring electrical plant for forward or aft bus

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Throttle man

A

Top machinist mate watch in space. Responsible for answering ordered speed changes from the bridge and EOOW

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Boiler Technician Upper Level/Distilling Plant Operator

A

Responsible for force draft blowers, main feed pumps, duct, distilling plant, and boiler

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Machinist Mate Upper Level

A

Responsible for ship service turbine generators and main engine, conducts SICLOS on ship service turbine generators

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Boiler Technician Lower Level

A

Responsible for main feed booster pumps, EFTP, and fuel system to boiler

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Machinist Mate Lower Level

A

Responsible for main condenser, MCP, ships service turbine generator auxiliaries, aligns lube oil purifier and conducts SICLOS on main engine

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Burner man

A

Responsible for lighting and extinguishing burners also makes up and breaks down burner barrels during midnight evolutions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Messenger

A

Responsible for taking reading on main engine and line shaft bearings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Jacking over main engine/ reduction gear

A

Keep the shaft from warping. Shaft rotated at 7 Revolutions per hour

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

SICLOS

A

Shift inspect clean lube oil strainer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Burner Barrel Change Out

A

Midnight evolution

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

4 Phases of Basic Steam Cycle

A

Generation
Expansion
Condensation
Feed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Reduction Gear

A

Reduces high RPM of turbines for proper RPM for propellers.

Classified as double input, double reduction, double helical articulated reduction gears

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Main engine

A

21 bearings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

High pressure

A

600-5000PSI
2 HPACS
1 in FWD Comp
1 in AFT Comp

21
Q

Purpose of HP Air

A
1-Emergency Diesel Start
2-Emergency raising and lowering of the deck edge elevators
3-Back up LP air
4-Inflatable Shaft Seals
5-Refilling SCBA bottles
22
Q

Low Pressure

A
100-125 PSI
8 LPACS
1A,1B,1C in FWD Comp
2A,2B,2C in AFT Comp
1D in FWD MMR
2D in AFT MMR
23
Q

Purposes for LP Air

A

1- Electronic dry air is used for wave guides and computer cooling on the 02 level and above

2- Vital air is used for boiler controls and forced draft blowers. Also aides in A/C plants in actuating capacity control systems

3- Non Viral air is used for non vital equipment such as pneumatic tubes and hand chippers and sanders, Ships laundry

24
Q

Air Conditioning Plants

A
6 ACs
York 300 ton centrifugal type using R-236fa Freon
1,2 FWD diesel
3,4 AMR
5,6 under port ace
25
Q

Refrigeration Plants

A

3 reefers on board 6 decks below post office.

Carrier 5.5 ton reciprocating type using R-134 Freon

26
Q

Methods of Operating Steering

A
1- Bridge
2- Trick Wheel
3- Emergency Steering
4- Emergency Hand Pump
5- Ratchet
27
Q

Fuel Oil Quality Management Program

A

Procedures for receipt and transfer of fuel. Stripping and inspection of tanks, safety precautions, lab analysis of fuel samples, and accountability logs

28
Q

Lube Oil Management Program

A

Provide requirements and procedures for monitoring and analysis of the quality of lubricating and hydraulic oils used in machinery aboard ships and service craft

29
Q

Lube Oil Samples are Taken When

A
1- MLOCS
2- Daily when operating
3- Upon receipt
4- Upon transfer
5- After a causality
6- Purifier Emergency( 30 minute start, every 4 hours after start)
30
Q

One a Lube Oil Sample is Taken

A

Inspected by space supervisor/EOOW

31
Q

Aqua Chem Distilling Plants on Board

A

Flashtype Distilling Unit, 6 Stage, 100,000 gal a day

32
Q

Boilers

A

Combustion engineering 600 modified 700 PSI V2M

33
Q

ABC’s of Engineering

A

Automatic boiler controls

34
Q

Two types of fuel

A

DFM F-76

JP5-F44

35
Q

MLOCS

A

Master light off check sheet

36
Q

3 Sizes of Sprayer Plates

A

5X- Used for light off and warming of boiler
6X- Used for normal steaming rates
6X Overload- Used for emergency situations when high steam demands are needed

37
Q

Red Handwheel

A

Fire main

38
Q

White handwheel

A

Steam

39
Q

Dark Blue HandWheel

A

Potable water

40
Q

Yellow

A

Fuel (F-76)

41
Q

Black and Yellow

A

Lube oil

42
Q

Ships Service Turbine Generators

A
5 SSTG’s onboard
1,2- FWD MMR
3- AMR
4,5- AFT MMR
SSTG rating- 450V, 60HZ, 4000 Amps, 2500KW
43
Q

Ships Service Emergency Diesel Generators

A

2 Diesels onboard

SS/EDG Rating- 450V, 60HZ, 3 phase, 3200 Amps, 2000KW

44
Q

ABT

A

Automatic bus transfer

45
Q

MBT

A

Manual Bus Transfer

2 sources of power to semi vital loads

46
Q

Shore Power Cables

A

20 cables total, 10FWD and 10 AFT

400 Amps per cable totaling 4000 Amps

47
Q

Load Shed

A

2 stages
1- trips all NON-Vital loads at 105% of SSTG rating
2-Trips all SEMI-Viral loads at 125% SSTG rating

48
Q

SSFC’s

A

Solid State Frequency Converters
400HZ
5 SSFC’s