What are the five pre-occupation planning parts?
COA Complete statement of requirement Are study Site survey Area assessment
What does SWEAT-MSS stand for?
Security and Protection Water Electricity Administration and HN training Trash Medical Sewage Shelter
What are the HLZ selection factors?
Mission (Temporary vs. Base camp) Size Obstacles Approach and departure route Construction (Slopes and material)
What are the four type of aerial resupply?
Sling load
Bundle drop
Cargo load
LCLA (low cost low altitude)
What are the five steps you should take when you relive in place?
100% inventory
Introduce incoming 18C to all key logistical PAX
Provide critical info on all ongoing projects and contracts
Ensure enough materials are on hand to continue project underway
Pre-order materials that will not be available to the incoming team
What are the three different phases of occupation?
Initial
Temporary
Permanent
What are the four component of defensive perimeter?
Surrounding area
Administrative area
Outer perimeter
Inner perimeter
What is the access road?
A single lane road going all the way into the camp