BAL-005 Flashcards

1
Q

BAL-005 requires BA’s scan rate must be no more than ___ to acquire data necessary to calculate Reporting ACE.

A

6 seconds

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

BAL-005 requires the BA notify its RC within ___, starting at the initial time ACE was not able to be calculated for ___.

A

45 minutes
30 consecutive minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

BAL-005 requires BA’s system used to calculate Reporting ACE be available a minimum of ___ each calendar year.

A

99.5%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

BAL-005 requires BA’s frequency metering equipment used for calculated Reporting ACE have a minimum accuracy of ___ and be available ___ of the year.

A

0.001HZ
99.95%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

___ and ___ were developed as ways to account for the generation and load in the appropriate BA’s ACE equation.

A

Dynamic Schedules
Pseudo Ties

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Dynamic Schedule is a ___ update in real time and is reflected in the ___ portion of the ACE equation.

A

telemetered reading or value
Scheduled Net Interchange

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Pseudo Tie is a ___ update in real time and used as a virtual tie line flow in the AGC/ACE equation but has no physical tie or energy metering device reflected in the ___ of the ACE equation.

A

telemetered reading or value
Actual Net Interchange

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The ___ system will partially replace the lost generation with ___ as it increases generators on automatic control in response to negative ACE reading. ___ should bring ACE back to normal values.

A

AGC
Regulating Reserves
Contingency Reserves

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

___ generators respond very quickly to AGC.

A

Hydro

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

___ generators respond slowly to AGC.

A

Gas turbines and fossil fuels

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Tie Line Bias Control

A

The BA uses the entire ACE equation including both the Interchange and the Frequency Components. NERC requires all BAs operate in this mode at all times.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Flat or Constant Frequency Control

A

Considers only the frequency portion of the ACE equation. Used only when area is islanded or separated from other areas.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Flat or Constant Tie Line Control

A

Considers only the Interchange portion of the ACE equation. Used only if frequency signal is unavailable/unreliable.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14