Authorization

A

An authorization is a formal statement issued by Sdge control center personnel or a star engineer that allows WORK to be performed on SDG&E’s primary electric system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Hold

A

A hold authorization is a formal statement from SDGe Grid control, EDO personnel, or start engineers that assure that a change of state of a name device will not occur until the hold authorization is released

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Hot line order

A

A hotline order authorization grant permission to perform work on or near energize conductors with an assurance that the conductors will not be re-energize by the GCC or DCC in the event of relay action by the particular circuit protective relays

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Ok

A

An OK authorization grant permission to perform a field activity that may have an effect on the electrical system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

transmission intercompany clearance authorization

A

This is an authorization between Sdg&e gcc and neighboring utility or generator control centers, assuring that the necessary switching has been performed to isolate the interconnected transmission lines from all known sources of potential at the issuers terminal