What is the purpose of Approved Document S?
To provide guidance on the provision of electric vehicle (EV) charging infrastructure in new and renovated buildings.
When did Approved Document S come into effect?
June 15, 2022.
Which types of buildings does Approved Document S apply to?
New residential buildings, new non-residential buildings, mixed-use buildings, and buildings undergoing major renovation.
Why was Approved Document S introduced?
To support the UK’s transition to electric vehicles by ensuring that new buildings and renovations include charging infrastructure.
Who is responsible for ensuring compliance with Approved Document S?
Developers, building owners, and building control authorities.
Which other parts of the Building Regulations interact with Approved Document S?
Part L (Energy Efficiency), Part P (Electrical Safety), and Part M (Accessibility).
How does Part L (Energy Efficiency) relate to electric vehicle charge points?
It ensures that charge points are energy-efficient and do not exceed unnecessary power demand.
How does Approved Document S interact with Part P (Electrical Safety)?
It requires that all EV charge points comply with electrical safety standards, including proper installation and testing.
Why is accessibility considered under Approved Document S?
To ensure that EV charge points are accessible for disabled users where possible.
What enforcement actions can be taken for non-compliance with Approved Document S?
Local authorities can refuse building approval, require modifications, or impose penalties.
What is the minimum requirement for EV charging infrastructure in new dwellings?
Each new dwelling with associated parking must have an EV charge point.
What considerations must be made when installing EV charge points?
Location, accessibility, electrical capacity, and compliance with safety standards.
What power output should a standard EV charge point provide?
At least 7kW AC, unless local grid constraints require a lower output.
How should developments with communal parking provide EV charging?
By installing charge points and ensuring cable routes for future expansion.
What role do building control authorities play in Approved Document S?
They assess compliance with the regulations during the planning and approval process.
What incentives exist for developers to install EV charging infrastructure?
Grants and funding schemes may be available to support installation costs.
What does Requirement S1 of Approved Document S cover?
The provision of electric vehicle (EV) charge points in new residential buildings with associated parking.
What is the primary requirement for EV charge points in new residential buildings?
Each new dwelling with an associated parking space must have at least one EV charge point.
What power output should an EV charge point provide in a new residential building?
At least 7kW AC with smart functionality, unless grid constraints apply.
Does Requirement S1 apply to all new residential buildings?
Yes, if they have associated parking and are not exempt due to grid capacity limitations.
Are apartment buildings required to provide EV charge points under S1?
Yes, new apartment buildings with associated parking must include charge points and cable routes for future expansion.
What is a cable route under Approved Document S?
A dedicated pathway for future EV charging infrastructure, ensuring easy installation without major structural modifications.
How many parking spaces must have cable routes in new apartment buildings?
Every parking space must have a cable route for future EV charge point installation.
What is the purpose of providing cable routes in new developments?
To future-proof developments for EV charging without requiring costly retrofits.