APP REVIEWER 2 Flashcards

1
Q

An embankment having a PI of 30%, LL of 40%, and GI of 0. What is the degree of compaction for this kind of soil?

A

95% Degree of Compaction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The minimum cement factor for concrete Class A is 9 bags / cu.m. How about for concrete Class B?

A

8 bags per cubic meter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Quality control testing in a DPWH project is the responsibility of the ____

A

Constractor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

When is the right time to start sampling and testing aggregates?

A

Once the source is identified

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The minimum compressive strength for concrete Class P is 5,000 psi. What is the minimum compressive strength of concrete Class C?

A

3,000 psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Where do we take additional cores when the measurement of any core taken from pavement is deficient in thickness by more than 25 mm?

A

At no less than 5 meter intervals parallel to the centerline in each direction from the affected location

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Under what climate condition do we use lower penetration grade or hard asphalt?

A

Hot climate (Cold climate is for higher penetration grade or soft asphalt)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the basis for the acceptance or rejection of any construction material?

A

Materials test results / reports

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Penetration test is for asphalt as cement is to ____

A

Consistency

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Slump test is a very important test in fresh concrete to determine ____

A

Consistency of concrete

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

How many samples should be taken for an asphalt mix for each full days operation?

A

1 - 3 samples

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The thickness of asphalt core using a caliper is based on how many measurements?

A

Four

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The thickness of concrete core using a caliper is based on how many measurements?

A

Nine

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Failed samples do not necessarily mean that the structure it represents is defective. Why?

A

Maybe the sampling is incorrect

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The specification calles for a 1:2:4 concrete mic. In a one bagger mixer, which of the following amount of water is most likely required for the mix?

A

20 Liters

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

How many samples shall be submitted for testing if 315 pails of flat wall enamel paint are to be used in the project?

A

4 pails

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

The spot test on asphalt is used to determine ____

A

Overheating during the process of manufacture

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Aggregate sub base course has a volume of 5,000 cu.m and to be laid in a 15 cm compacted depth. How many samples shall be submitted for CBR test and for sieve analysis?

A

2 samples for CBR
17 samples for sieve analysis

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

How many samples shall be submitted for quality test if 60 tons of Bituminous Prime Coat is to be used in the project?

20
Q

How many compaction tests shall be conducted for Item 201 having a volume of 8,250 cu.m?

A

6 compaction tests

21
Q

What composed of Materials Quality Control Monthly Reports?

A

Summary of field tests and status of tests

22
Q

What is the required mixing of mortar for Item 505 (Stone Masonry)

A

1 part cement and 2 parts sand by volume with sufficient water

23
Q

What is the required mixing of mortar for Item 500 (Pipe Culverts and Storm Drains)?

A

1 part cement and 2 parts sand by volume with sufficient water

24
Q

Before the project starts, the Materials Engineer or the technician must have a program on how many samples for each item of work should be tested based on the minimum testing requirements. What program or report is this?

A

Quality Control Program

25
If sample splitter is not available for use in reducing samples for test, what is the alternative way of reducing sample for testing size?
Apply quartering method and get two opposite sides as sample
26
Minimum moisture content at which the soil can be molded without breaking or crumbling up to 1/8 (3.2 mm)
Plastic Limit
27
Moisture content corresponding to 25 blows
Liquid Limit
28
The concrete has been tested for consistency by the use of a slump cone with base and tamping rod. After the test, the height of concrete measured is 178 mm. What is the slump of the concrete
127 mm
29
What is the rate of revolution of an abrasion machine used for testing the mass percent of water?
30 - 33 rpm
30
After the soil has been tested in an Abrasion Machine, the mass % of water computed is 21%. If this material is for Item 201, does it pass the DPWH specs?
Yes, because the specs is 50% maximum
31
Quality Control Assurance Report should be submitted every ____
Week
32
One of the duties of Materials Engineer is to see to it that all the onstruction materials are tested ____
Before it is incorporated into work
33
What is the maximum depth of roadway embankment per horizontal layer in loose measurement?
200 mm loose measurement
34
Why is it that 6 samples are needed for quality test of concrete masonry?
3 samples for compressive strength and 3 samples for absorption
35
Along the slope of high embankment, ____ is provided as an erosion control measures and also to improve the stability of the slope
Berm
36
If course aggregate like embankment is to be placed in layers, how many layers should a 40 cm thick aggregate base course is placed?
3
37
How long deep does a vibrator have to be inserted in a concrete mix?
Not to exceed 15 seconds at 50-60 cm interval
38
CBR Sample for test has been compacted but it should be soaked for how many days before testing?
Four
39
CBR Sample for test has been compacted but it should be soaked for how many days before testing?
Four
40
If sieve analysis and plasticity tests are used for soil classification, what test its result be used in field density test?
Compaction Test or Moisutre Density Relation Test
41
Heavy rain occurs the night before the scheduled field density test. Are you going to pursue the schedule? Why?
No, because the moisture content is high and can affect the result
42
Checking the gradation of composite aggregates and asphalt content of asphalt mix can be done by what test?
Extraction Test
43
In soil and sub surface explorations for flood control design of foundation condition, a soil sample was taken for field and laboratory tests. The test required for soil was taken, except
Specific gravity, abrasion, water content
44
Structure crossing above such covered underground drainage conduit shall be laid at least ___ above the top of the conduit
0.5m, 1.0m, 1.5m, 2.0m
45
Class of stones for riprap ranging from 30kg to a maximum of 70kg with at least 50% of the stones weighing more than 50kg
Class B