AOPs Flashcards
- 0POP04-FH-0001 Fuel Handling Accident*
- *
After a fuel handling accident, how long does an operator have to place a train of CRE HVAC in emergency mode?
2 hrs
- 0POP04-FW-0001 Loss of SG Level Control*
- *
How long can a SGFPT be operated at 5500 - 5600 RPM?
1 hr maximum
Individual SGFP flow shall be greater than 11,000 gpm
- D/P across impeller will not be above design.
- 0POP04-ZO-0005 Chemical Spills / Toxic Gas Release*
- *
What is an unauthorized discharge of oil?
Harmful quantity of oil from site into coastal waters or threatens to enter coastal waters within 12 hrs.
Harmful quanity of oil is sufficient to create a visible film / sheen or cause sludge buildup beneath the water
Note:
Discharge into Main Cooling Reservoir does NOT constitute an unauthorized discharge
- 0POP04-AE-0001 Loss of AC Power*
- *
If power is lost to all ESF busses, then an operator must be sent to shed the Channel I sequencer. How long does the operator have to perform this action?
30 mins
- 0POP04-CR-0001 Loss of Condenser Vacuum*
- *
What are the important values of main condenser vacuum? (i.e. alarms, actuations, ect.)
- 26” Hg:*
- *Condenser Vacuum Low Alarm (≤ 80% power)**
Standby CARS pump starts
- 24” Hg:*
- *Condenser Vacuum Low Alarm (> 80 power)**
- 22” Hg:*
- *C-9**
- 21” Hg:*
- *Main Turbine Trip**
- 0POP04-DC-0001 Loss of 250VDC Power*
- *
If power is lost to the 250VDC switchboard, the turbine trips, and a LOOP occurs at the same time, what must the operator do?
Depressurize the MG within 2 hrs
- 0POP04-CR-0001 Loss of Condenser Vacuum*
- *
What must be done if main turbine vacuum is < 21” Hg?
Ensure Rx Tripped
Ensure Turbine Tripped
Perform 0POP05-EO-EO00
- 0POP04-NI-0001 Nuclear Instrumentation Malfunction*
- *
What must the operator do if only 1 Source Range / Extended Range NI is OPERABLE?
Suspend Core Alterations
Suspend Operations that would dilute RCS < LCO 3.9.1
Borate to .95 Keff
- 0POP04-CC-0002 Loss of CCW*
- *
What must RCS temperature be less than in order to run the RHR pumps without seal cooling?
< 120 ˚F
- 0POP04-NI-0001 Nuclear Instrumentation Malfunction*
- *
What are your actions if the plant is in MODES 3-5 and both extended range NIs are lost?
Suspend positive reactivity changes [Immediately]
Isolate unborated water paths from RMW system to RCS [15 mins]
Restore 1 channel to OPERABLE [1 hr]
OR
Secure unborated water sources [2 hrs]
AND
Verify SDM [4 hrs and 12 hrs after]
- 0POP04-ZO-0008 Fire/Explosion*
- *
When a fire or explosion occurs in the switchyard, when can plant personnel enter the switchyard?
Once Centerpoint Energy arrives and assesses the damage
- 0POP04-FW-0002 SGFP Trip*
- *
Operation in what power levels is not permitted with > 1 GV out of service?
20 - 75% Power
Could result in rotor damage due to Double Shock Condition.
- 0POP04-RP-0001 Loss of Automatic PZR Pressure Control*
- *
What must be done if the PZR spray valves fail to close?
- Initially:*
- *Ensure all PZR heaters energized**
Monitor PZR pressure
- Continues to lower:*
- *Ensure Rx Tripped**
Ensure Turbine Tripped
Stop RCP 1A
Stop RCP 1D
If it continues to lower stop all but 1 RCP
Perform 0POP05-EO-EO00
- 0POP04-RH-0001 Loss of RHR*
- *
What must Hot Leg level be in order to start a RHR pump?
- *> +6 Inches**
- Maintain +8 to +11 Inches*
- ≥ -3 Inches: Level is restored with a CCP.
- < -3 Inches: Level is restored with a LHSI.
- 0POP04-AN-0001 Loss of Control Room Annunciator Alarms*
- *
What will the operator do, with regards to Rx Power, during a loss of all control room annunciators?
Do not downpower unless required by Tech Specs
- 0POP04-AE-0001 Loss of AC Power*
- *
If a Class 1E battery is realigned to an operating battery charger in ≤ 15 min AND ≤ 1 battery cell is jumpered, then what must be done to declare it OPERABLE?
Verify Operating Battery Charger normal float voltage ≥ 128.5 VDC
Note:
A Class 1E battery is INOPERABLE anytime it is NOT aligned to an operating battery charger.
- 0POP04-CC-0002 Loss of CCW*
- *
What must be done if all CCW is secured and cannot be restarted?
Trip Reactor
Trip Turbine
- *Trip RCPs**
- Within 1 minute*
Perform 0POP05-EO-EO00
Will also start the PDP and secure CCPs later on in the procedure.
- PDP is less susceptible to damage than CCPs for a loss of CCW.
- 0POP04-FH-0001 Fuel Handling Accident*
- *
If damage occurs to an irradiated fuel assembly during a fuel handling accident, what is the potential emergency classification?
Alert
- 0POP04-AE-0004 Loss of power to ≥ 1 4.16 kV ESF Busses*
- *
What is the load restriction on each winding of the emergency transformer?
2762 KW / winding
- Used in the event of LOOP w/ LOCA.
- Aids in keeping ESF bus > 4.0 kV
Note:
If only 1 ESF bus is available and it will be loaded on emergency transformer, then load limit is N/A but must maintain > 4.0 kV on ESF bus.
- 0POP04-RC-0002 RCP Off Normal*
- *
What RCP Case and Shaft Vibrations would require the operator to trip the RCP?
Case Vibration:
≥ 5 mils
≥ 3 mils and rising ≥ 0.2 mils/hr
- Shaft Vibration:*
- *≥ 20 mils**
- *≥ 15 mils and rising ≥ 1 mils/hr**
- Ensure Rx Tripped
- Ensure Turbine Tripped
- Stop affected RCPs
- Perform 0POP05-EO-EO00
- 0POP04-AE-0001 Loss of AC Power*
- *
What 13.8kV / 4.16 kV busses does 0POP04-AE-0001 NOT cover?
1K
1L
1M
- 0POP04-AE-0001 Loss of AC Power*
- *
What must the operator do if power is lost to a RCP while in MODES 1-2?
Trip the Rx
Perform 0POP05-EO-EO00
CIP requires operator to trip the Rx even if power below P-8.
- 0POP04-CR-0001 Loss of Condenser Vacuum*
- *
Step 2 in 0POP04-CR-0001 has you check the proper number of CW pumps are running. What determines the proper number of CW pumps?
- CW Inlet Temperature > 69 ˚F:*
- *4 CW Pumps**
- CW Inlet Temperature ≤ 69 ˚F:*
- *3 CW Pumps**
- *Condenser ∆T ≥ 25 ˚F indicates insufficient CW Flow**
- Normally ≈ 20 ˚F*
2 CW Pump operation is only acceptable when starting or securing CW.
If 2 CW pump operation is required in MODES 1-2:
- Requires Plant Management Approval
- Must maintain discharge pressure on both CW pumps (≥ 3 psig)
- 0POP04-CV-0003 Emergency Boration*
- *
What flowrate must be maintained when emergency borating with the CCP?
≥ 50 gpm
- CCP: 50 gpm
- Gravity Feed: 50 gpm
- RWST: 190 gpm
Note:
50 gpm is chosen b/c 30 gpm is required by tech specs and 20 gpm is for seals
- 0POP04-ZO-0005 Chemical Spills / Toxic Gas Release*
- *
How long does the operator have to inform the NRC if a toxic or flammable gas release is occuring within the site boundary or affecting the site?
1 Hour
Must also notify the Texas General Land Office (GLO) within 1 Hour.
- 0POP04-RS-0001 Control Rod Malfunction*
- *
What are your actions if ≥ 2 shutdown rods are not fully withdrawn?
LCO 3.0.3
- 0POP04-RC-0004 SG Tube Leakage*
- *
What must the operator do if the intact or affected SG’s level cannot be maintained > 20% SGNR level?
Ensure Rx Tripped
Initiate SI
Perform 0POP05-EO-EO00
- 0POP04-RC-0002 RCP Off Normal*
- *
What RCP Motor Stator Winding temperature would require the operator to trip the RCP?
≥ 310 ˚F
- Ensure Rx Tripped
- Ensure Turbine Tripped
- Stop affected RCPs
- Perform 0POP05-EO-EO00
- 0POP04-ZO-0001 Control Room Evacuation*
- *
If the primary RO has evacuated to the ASP and he notices the Rx is not tripped, how does he trip the Rx?
Dispatch operator to open Rx trip breakers locally and secure RDMG sets
- 0POP04-CV-0003 Emergency Boration*
- *
What control room annunciators will require the operator to emergency borate?
- *BANK INSERT LO-LO**
- 5M03 E-4*
- *QDPS ALARM S/D MONITOR**
- 4M08 A-5*
- 0POP04-RS-0001 Control Rod Malfunction*
- *
What conditions require a Rx trip in 0POP04-RS-0001 Control Rod Malfunction?
Rods in Manual w/ continued rod motion
More than 1 rod dropped
S/D required but malfunction prevents controlled S/D
- 0POP04-FW-0002 SGFP Trip*
- *
What must the operator do if Rx Power is ≥ 5% and SGNR Water Level cannot be maintained < 87.5%?
Trip Rx
Perform 0POP05-EO-EO00
- 0POP04-RH-0001 Loss of RHR*
- *
What must be done if in Cold leg injection is occuring and CETs read > 200 ˚F?
Shift to HL Injection
OR
Start another LHSI pump
- 0POP04-ZO-0001 Control Room Evacuation*
- *
Where do plant personnel go once the MCR is evacuated?
ASP:
SM
Primary RO
- ESF Train A:*
- *Secondary RO**
- ESF Train B:*
- *Unit Supervisor**
- ESF DGs / ESF Train C:*
- *MAB Safe S/D**
- Goes to each ESF DG 1st*
- ECW / RCP breakers:*
- *TG Safe S/D**
- 0POP04-CV-0003 Emergency Boration*
- *
What must be done if excess letdown is aligned to the CCP suction and it is desired to use the RWST or gravity to emergency borate?
Align excess letdown to VCT
Since Excess Letdown may be of a higher pressure than the boration flowpath from the BAT using Gravity Feed or using the RWST, it is necessary to ensure that Excess Letdown is aligned to the VCT rather than the charging pump suction.
- 0POP04-NI-0001 Nuclear Instrumentation Malfunction*
- *
What are your actions if a SR detector fails when power is < P-6 (1x10-10 IR amps)
- Failed High:*
- *Ensure Rx Tripped**
Go To 0POP05-EO-EO00
- Failed Low:*
- *Suspend positive reactivity changes**