AOPs Flashcards
(92 cards)
- 0POP04-FH-0001 Fuel Handling Accident*
- *
After a fuel handling accident, how long does an operator have to place a train of CRE HVAC in emergency mode?

2 hrs

- 0POP04-FW-0001 Loss of SG Level Control*
- *
How long can a SGFPT be operated at 5500 - 5600 RPM?

1 hr maximum
Individual SGFP flow shall be greater than 11,000 gpm
- D/P across impeller will not be above design.

- 0POP04-ZO-0005 Chemical Spills / Toxic Gas Release*
- *
What is an unauthorized discharge of oil?
Harmful quantity of oil from site into coastal waters or threatens to enter coastal waters within 12 hrs.

Harmful quanity of oil is sufficient to create a visible film / sheen or cause sludge buildup beneath the water
Note:
Discharge into Main Cooling Reservoir does NOT constitute an unauthorized discharge
- 0POP04-AE-0001 Loss of AC Power*
- *
If power is lost to all ESF busses, then an operator must be sent to shed the Channel I sequencer. How long does the operator have to perform this action?

30 mins

- 0POP04-CR-0001 Loss of Condenser Vacuum*
- *
What are the important values of main condenser vacuum? (i.e. alarms, actuations, ect.)

- 26” Hg:*
- *Condenser Vacuum Low Alarm (≤ 80% power)**
Standby CARS pump starts
- 24” Hg:*
- *Condenser Vacuum Low Alarm (> 80 power)**
- 22” Hg:*
- *C-9**
- 21” Hg:*
- *Main Turbine Trip**

- 0POP04-DC-0001 Loss of 250VDC Power*
- *
If power is lost to the 250VDC switchboard, the turbine trips, and a LOOP occurs at the same time, what must the operator do?

Depressurize the MG within 2 hrs

- 0POP04-CR-0001 Loss of Condenser Vacuum*
- *
What must be done if main turbine vacuum is < 21” Hg?

Ensure Rx Tripped
Ensure Turbine Tripped
Perform 0POP05-EO-EO00

- 0POP04-NI-0001 Nuclear Instrumentation Malfunction*
- *
What must the operator do if only 1 Source Range / Extended Range NI is OPERABLE?

Suspend Core Alterations
Suspend Operations that would dilute RCS < LCO 3.9.1
Borate to .95 Keff

- 0POP04-CC-0002 Loss of CCW*
- *
What must RCS temperature be less than in order to run the RHR pumps without seal cooling?

< 120 ˚F

- 0POP04-NI-0001 Nuclear Instrumentation Malfunction*
- *
What are your actions if the plant is in MODES 3-5 and both extended range NIs are lost?

Suspend positive reactivity changes [Immediately]
Isolate unborated water paths from RMW system to RCS [15 mins]
Restore 1 channel to OPERABLE [1 hr]
OR
Secure unborated water sources [2 hrs]
AND
Verify SDM [4 hrs and 12 hrs after]

- 0POP04-ZO-0008 Fire/Explosion*
- *
When a fire or explosion occurs in the switchyard, when can plant personnel enter the switchyard?

Once Centerpoint Energy arrives and assesses the damage

- 0POP04-FW-0002 SGFP Trip*
- *
Operation in what power levels is not permitted with > 1 GV out of service?

20 - 75% Power

Could result in rotor damage due to Double Shock Condition.
- 0POP04-RP-0001 Loss of Automatic PZR Pressure Control*
- *
What must be done if the PZR spray valves fail to close?

- Initially:*
- *Ensure all PZR heaters energized**
Monitor PZR pressure
- Continues to lower:*
- *Ensure Rx Tripped**
Ensure Turbine Tripped
Stop RCP 1A
Stop RCP 1D
If it continues to lower stop all but 1 RCP
Perform 0POP05-EO-EO00

- 0POP04-RH-0001 Loss of RHR*
- *
What must Hot Leg level be in order to start a RHR pump?

- *> +6 Inches**
- Maintain +8 to +11 Inches*
- ≥ -3 Inches: Level is restored with a CCP.
- < -3 Inches: Level is restored with a LHSI.

- 0POP04-AN-0001 Loss of Control Room Annunciator Alarms*
- *
What will the operator do, with regards to Rx Power, during a loss of all control room annunciators?

Do not downpower unless required by Tech Specs

- 0POP04-AE-0001 Loss of AC Power*
- *
If a Class 1E battery is realigned to an operating battery charger in ≤ 15 min AND ≤ 1 battery cell is jumpered, then what must be done to declare it OPERABLE?

Verify Operating Battery Charger normal float voltage ≥ 128.5 VDC

Note:
A Class 1E battery is INOPERABLE anytime it is NOT aligned to an operating battery charger.
- 0POP04-CC-0002 Loss of CCW*
- *
What must be done if all CCW is secured and cannot be restarted?

Trip Reactor
Trip Turbine
- *Trip RCPs**
- Within 1 minute*
Perform 0POP05-EO-EO00
Will also start the PDP and secure CCPs later on in the procedure.
- PDP is less susceptible to damage than CCPs for a loss of CCW.

- 0POP04-FH-0001 Fuel Handling Accident*
- *
If damage occurs to an irradiated fuel assembly during a fuel handling accident, what is the potential emergency classification?

Alert

- 0POP04-AE-0004 Loss of power to ≥ 1 4.16 kV ESF Busses*
- *
What is the load restriction on each winding of the emergency transformer?

2762 KW / winding
- Used in the event of LOOP w/ LOCA.
- Aids in keeping ESF bus > 4.0 kV
Note:
If only 1 ESF bus is available and it will be loaded on emergency transformer, then load limit is N/A but must maintain > 4.0 kV on ESF bus.

- 0POP04-RC-0002 RCP Off Normal*
- *
What RCP Case and Shaft Vibrations would require the operator to trip the RCP?

Case Vibration:
≥ 5 mils
≥ 3 mils and rising ≥ 0.2 mils/hr
- Shaft Vibration:*
- *≥ 20 mils**
- *≥ 15 mils and rising ≥ 1 mils/hr**
- Ensure Rx Tripped
- Ensure Turbine Tripped
- Stop affected RCPs
- Perform 0POP05-EO-EO00

- 0POP04-AE-0001 Loss of AC Power*
- *
What 13.8kV / 4.16 kV busses does 0POP04-AE-0001 NOT cover?

1K
1L
1M

- 0POP04-AE-0001 Loss of AC Power*
- *
What must the operator do if power is lost to a RCP while in MODES 1-2?

Trip the Rx
Perform 0POP05-EO-EO00
CIP requires operator to trip the Rx even if power below P-8.

- 0POP04-CR-0001 Loss of Condenser Vacuum*
- *
Step 2 in 0POP04-CR-0001 has you check the proper number of CW pumps are running. What determines the proper number of CW pumps?

- CW Inlet Temperature > 69 ˚F:*
- *4 CW Pumps**
- CW Inlet Temperature ≤ 69 ˚F:*
- *3 CW Pumps**
- *Condenser ∆T ≥ 25 ˚F indicates insufficient CW Flow**
- Normally ≈ 20 ˚F*
2 CW Pump operation is only acceptable when starting or securing CW.
If 2 CW pump operation is required in MODES 1-2:
- Requires Plant Management Approval
- Must maintain discharge pressure on both CW pumps (≥ 3 psig)

- 0POP04-CV-0003 Emergency Boration*
- *
What flowrate must be maintained when emergency borating with the CCP?

≥ 50 gpm
- CCP: 50 gpm
- Gravity Feed: 50 gpm
- RWST: 190 gpm
Note:
50 gpm is chosen b/c 30 gpm is required by tech specs and 20 gpm is for seals




































































































































