Annex 3 Operation of Crematorium Flashcards
General Requirements for Crematorium
IP and OP from CHD
*Application
*Zoning Clearance
*Project description of the proposed crematorium
*Detailed plan and specification of crematorium
*Site development plan
General Requirements for Crematorium
IP and OP from CHD
*Application
*Zoning Clearance
*Project description of the proposed crematorium
*Detailed plan and specification of crematorium
*Site development plan
________ from CHD is issued only after inspection and evaluation by the regional sanitary engineer
Operational Permit
No crematorium shall be operated without a _________ from local health office where the crematorium is located
Sanitary Permit
Operational Permit shall be required for the __________
Issuance of sanitary permit
All personnel responsible for the care, handling, transport and disposal of the deceased by cremation must be ___________
DOH certified undertaker
ONLY __________ shall be allowed to enter cremation room
crematorium personnel
A crematorium must have:
*Cremation room
*Waiting room/ viewing room
*Toilet facilities
*Hand washing facilities
Cremation room shall be separated by transparent glass and concrete wall from the _________
Waiting/ viewing room
_________ shall be provided with sufficient firefighting equipment as approved by the local fire department
Crematorium
Gas room/storage shall be constructed with _________
Concrete or impervious materials
Gas room/storage shall be located _____________ from the cremation and waiting/viewing rooms
below the ground 5 meters away
There shall be an inlet measuring ________ at the cremation room
75cm by 75cm
If single crematorium equipment is installed for proper combustion and cooling of the equipment, inlet may be ________ and _________ and located near the rear of the unit
louvered and screened
Minimum temperature of crematorium oven
800°C