Annex 1 IP&OP of Burial Ground Flashcards
(For both public and private burial ground)
Initial Permit and Operational Permit shall be filed in ____________
Center for Health and Development (CHD)
Requirements for Initial Permit for public burial ground
- Resolution of the brgy/municipal/city council
- Photocopy of the title of lot ownership (deed of donation if donated)
- Certification from the Provincial Health Officer
- Certification from DPWH or Natural Water Resources Board
- Plans for construction of wall /BAKOD
- Plans for construction of funeral viewing area
- Construction plans for MAIN ROADS and LOTS and SECTIONS in the burial ground
- Drainage system
- Topographic map of cemetery
- Site development plan
Minimum height of plans for construction of wall (bakod)
2 meters around the cemetery
Materials for plans for the construction of wall (bakod)
Concrete wall, steel grille or combination
Minimum area for the plans for the construction of funeral viewing area
(Chapel, structure or building for public assembly)
Where funeral ceremonies may held
Minimum area of 50 square meters (5x10 meters)
Construction plans:
_________ wide main road from the gate to the rear
_________ minimum cross roads which divide the cemetery in lots and sections
4 meters wide and 1 meter minimum cross roads
Site Development Plan showing the following technical descriptions:
*Archives
*Address and location
*Dimension
*Plans and amenities (building)
*25-50 limit zone (25 meters for dwelling houses, 50 meters for water reservoir)
Requirements for Initial Permit for Private Burial Ground
- Resolution of the brgy/city/municipal council for the burial ground
-
Photocopy of land of ownership, deed of donation if donated
Certification from DPWH or NWRB
Site development plan
etc. ….
Minimum land size for private burial ground
1.2 hectares which will provide 50 meters buffer zone delineated from nearest water reservoir
Burial: limited to _______ niches/graves at an area not more than ________ should be located at the center of the proposed site
10 niches/graves, not more than 30 square meters
Additional burials shall not exceed to or go beyond the ________,
Construction only on ________ (over and above)
30 square meters, only on existing niches
Maximum height of niches for burial grounds
4 niches or 3-meter high
Validity of Initial Permit
2 years from the day of issuance
Application for the Operational Permit shall be filed after the _____________ of the burial ground
completed construction works
Operational Permit shall be issued by the ____________
CHD Director IV