Annex 2 Sanitation Permit for Burial Ground Flashcards
Required Sanitation Standard for Burial Ground
- Approved IP and OP for the burial ground
- Sanitary facilities
- Water supply
- Food and drink establishment
- Sewage disposal and drainage
- Solid waste management
- Vermin control
Toilet and hand washing facilities must be _______,______,_______
adequate, clean, accessible
_________ shall be completely closed, properly lighted and ventilated, and walls are painted with light colors
Toilet rooms
Water supply in burial ground shall be ___________
*sufficient supply
*for domestic use
*from public or from a private water supply system
Dispensing food and drink in burial ground shall be in accordance with ___________
Chapter III- ‘‘Food Establishment” of the Code on Sanitation of the Philippines (PD856) and its IRR
Burial ground sewage system shall be connected to a public sewerage system, in absence ________ or ___________
septic tank, or other wastewater treatment facility
Chapter 18 of PD856
Disposal of Refuse
Burial ground should provide atleast 2 refuse containers, ________ and _________ with tight cover
1 biodegradable and 1 non-biodegradable
________ of the burial ground shall collect the refuse.
Personnel
Accumulation of refuse shall not be permitted to avoid harborage and breeding places of _________
vermin
Chapter 16 of PD856
Vermin Control
Vermin abatement program is maintained by __________
Owner, operators and administrators
No person shall be employed in any burial ground establishment without _____________
without a health certificate