additional info Flashcards

You may prefer our related Brainscape-certified flashcards:
1
Q

what is ISO

A

Organisation Internationale de Standardisation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

what is CEN

A

Comité Européen de Normalisation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

define ASHRAE 55

A

ANSI/ASHRAE Standard 55-2010 defines the range of indoor thermal environmental conditions acceptable to a majority of occupants, but accommodates an ever increasing variety of design solutions intended both to provide comfort and to respect today’s imperative for sustainable buildings.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

define ISO Standard 14025

A

ISO 14025:2006 establishes the principles and specifies the procedures for developing Type III environmental declaration programmes and Type III environmental declarations. It specifically establishes the use of the ISO 14040 series of standards in the development of Type III environmental declaration programmes and Type III environmental declarations.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

define ISO Standard 14040

A

ISO 14040:2006 describes the principles and framework for life cycle assessment (LCA) including: definition of the goal and scope of the LCA, the life cycle inventory analysis (LCI) phase, the life cycle impact assessment (LCIA) phase, the life cycle interpretation phase, reporting and critical review of the LCA, limitations of the LCA, the relationship between the LCA phases, and conditions for use of value choices and optional elements.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

define ISO Standard 14044

A

ISO 14044:2006 specifies requirements and provides guidelines for life cycle assessment (LCA) including: definition of the goal and scope of the LCA, the life cycle inventory analysis (LCI) phase, the life cycle impact assessment (LCIA) phase, the life cycle interpretation phase, reporting and critical review of the LCA, limitations of the LCA, relationship between the LCA phases, and conditions for use of value choices and optional elements.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

define EN Standard 15804

A

wut wut

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

define ISO Standard 21930

A

ISO 21930:2007 provides the principles and requirements for type III environmental declarations (EPD) of building products.

ISO 21930:2007 contains specifications and requirements for the EPD of building products. Where this International Standard contains more specific requirements, it complements ISO 14025 for the EPD of building products.

ISO 21930:2007 provides a framework for and the basic requirements for product category rules as defined in ISO 14025 for type III environmental declarations of building products. Type III environmental declarations for building products, as described in ISO 21930:2007, are primarily intended for use in business-to-business communication, but their use in business-to-consumer communication under certain conditions is not precluded.

ISO 21930:2007 does not define requirements for developing type III environmental declaration programmes. Requirements for type III environmental declaration programmes are found in ISO 14025.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

define REACH

A

REACH is the Regulation on Registration, Evaluation, Authorisation and Restriction of Chemicals. It entered into force on 1st June 2007. It streamlines and improves the former legislative framework on chemicals of the European Union (EU).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the exemplary performance for the High-Priority Site credit?

A

Earn either option 2 (priority designation) OR option 3 (brownfield remediation) in addition to option 1 (historic district)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the two options for Schools for Access to Quality Transit?

A
  • opt. 1 : transit-served (400/800m + weekday trips)

- opt. 2 : pedestrian access (1, 2 or 4 points : 50%, 60% and 70%)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How can Exemplary Performance can be achieved for Reduced Parking Footprint?

A

Achieve 60% and 80% reduction (instead of 20% and 40%)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How can Exemplary Performance be achieved for LT Credit Green Vehicles?

A

Not available.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What are the two options for the achievement of SS Credit Site Development – Protect or Restore Habitat?

A

Opt. 1 : Restore 30% including bldg footprint of all portions of site identified as previously disturbed (1.5 FAR may include green roofs)
Opt. 2 : Financial support (0.40 $/SF)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

How can Exemplary Performance be achieved for SS Credit Site Development – Protect or Restore Habitat?

A
  • Opt. 1 : Double requirements to 60% of restoration

- Opt. 2 : Double financial support.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

How to obtain SS Credit Open Space?

A

Provide outdoor space greater than or equal to 30% of total area site of which 25% must be vegetated.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Describe the 2 options for SS Credit Rainwater Mgmt?

A

Opt. 1 : percentile of rainfall events
Opt. 2 : Natural land cover conditions (manage on site annual increase in runoff volume from natural land cover condition to postdeveloped condition)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Describe the requirements for SS Credit : Light Pollution Reduction

A

Opt. 1 : BUG Rating Method
Opt. 2 : Calculation method (do net exceed percentages of total lumens emitted above horizontal for every LZ zone)

this applies both to uplight and light trespass

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

What are the subsystems that need to be 100% submetered

A

Boiler water, reclaimed water.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

What are the 3 options for SS Credit Joint Use of Facilitiea

A
  • opt. 1 : make bldg space open to gen. public (at least 3 spaces)
  • opt.2 : contract w/ specific organization to share bldg space (at least 2 types of dedicated-use spaces)
  • opt.3 : use shared space owned by other org. (at least 2 spaces)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

What are the 2 options for WE Prereq Outdoor Water Use Reduction?

A
  • opt. 1 : no irrigation

- opt. 2 : 30% reduction from baseline for site’s peak watering month

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

How can WE Prereq Indoor Water Use Reduction be earned?

A

reduce aggregate water consumption by 20% from building baseline

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

3 infos about the WE prereq Bldg-Level Water Metering

A
  • measure total potable water use
  • monthly or annual summaries
  • manual or automated
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

What are the 2 options for the WE Credit Outdoor Water Use Reduction? What about exemplary performance?

A
  • opt. 1 : no irrigation
  • opt. 2 : 50% reduction from baseline for site’s peak watering month

no exemplary performance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

What are the requirements for WE Efficiency Credit Water Metering

A

Install permanent meters for 2 or more of the following :

  • irrigation (80%)
  • indoor fixtures and fittings (80%)
  • DHW (80%)
  • boiler (100%)
  • reclaimed (100%)
  • other process water (80%)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

What must the CxA do? (required for EA Prereq, Fundamental Commissioning and Verification)

A
  • review the OPR, BOD and project design,
  • develop and implement a Cx Plan,
  • Confirm incorporation of Cx requirements into the construction documents,
  • Develop construction checklists,
    Develop a system test procedure,
  • Verify system test execution,
  • Maintain an issues and benefits log thourghout the Cx process
  • Prepare a final Cx process report,
  • Document all findings and recommendations + report to owner.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

For an LCA assessment, what criterias must match?

A
  • LCA Scope
  • Size
  • Function
  • Orientation
  • Location (climate zone)
  • Operating Energy Efficiency
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

Describe Option 1 for EA Prereq Minimum Energy Performance

A

Demonstrate an improvement of 5% (NC), 3%(Major Renovations) or 2% (CS) in proposed bldg performance rating compared to baseline ASHRAE 90.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

Describe Option 2 for EA Prereq Minimum Energy Performance

A

Comply with HVAC and service water heating requirements for ASHRAE 50% Advanced Energy Design Guide

30
Q

Describe Option 3 for EA Prereq Minimum Energy Performance

A

Have the engineer include in the plans :

  • Supply Air Temperature Reset (VAV)
  • Premium Economizer Performance
  • Variable Speed Control
31
Q

What are the distance thresholds for Pedetrian Access (option 2, LT Credit Access to Quality Transit?)

A

1200 m for ages 14 and below (grade 8 and below)

2400 m for ages 15 and above (grade 9 and above)

32
Q

With what can the ANSI Consensus National Standard Guide 2.0 for Design and Construction of Sustainable Buildings and Communities be associated?

A

This standard provides step-by-step guidance on a replicable, integrative process.

33
Q

What are the two options for EA Credit Optimize Energy Performance

A

Opt. 1 : Whole-bldg energy simulation

Opt. 2 : Prescriptive Compliance : ASHRAE Advanced Energy Design Guide

34
Q

What are the thresholds for EA Credit Green Power and Carbon Offsets?

A

50% : 1 point

100% : 2 points

35
Q

What is Scope 1 emissions

A

greenhouse gases emitted directly (i.e. fossil fuels burned on site)

36
Q

What is Scope 2 emissions

A

greenhouse gases associated with purchased electricity and also w/ high temperature hot water, chilled water or steam (that comes from a utility provider)

37
Q

What are the 4 options for MR Credit Bldg Life-Cycle Impact Reduction

A

Opt. 1 : Historic Bldg Reuse
Opt. 2 : Renovation of abandoned or blighted bldg e.
Opt. 3 : Bldg and material reuse
Opt. 4 : Whole-bldg life-cycle assessment

38
Q

Describe Opt. 2 for MR Credit Bldg Life-Cycle Impact Reduction

A

Renovation or abandoned or blighted bldg (at least 50% by surface area of existing structure, enclosure, interior structural elements, etc.) Up to 25% may be excluded from calculations b/c of deterioration damage.

39
Q

Describ Opt. 3 for MR Credit Bldg Life-Cycle Impact Reduction + state exemplary performance

A

Bldg and Material reuse : min. 25% reuse or salvage bldg materials from off site or on site as percentage of surface area. EP is 95% building reuse.

40
Q

Describe Opt. 4 for MR Credit Bldg Life-Cycle Impact Reduction

A

Conduct a LCA of the projec’ts structure and enclosure that demonstrates a minimum 10% reduction, compared w/ a baseline bldg, in @ least 3 of the six impact categories, one of which must be GWP.

41
Q

What are the 2 options for MR Credit Building Product Disclosure and Optimization – Environmental Product Declarations

A

Opt. 1 : EPD (3 values, 3 types)
Opt. 2 : 3rd party certified products, demonstrate reductions below industry average in at least 3 of the impact categories

42
Q

What are the two options for MR Credit Building Product Disclosure and Optimization – Sourcing of Raw Materials

A

Opt. 1 : Raw material source and extraction reporting (20 products, 5 manufacturers)
Opt.2 : Leadership extraction practices, 25% by cost (EPR, bio-based, wood, reuse, recycled, USGBC approved)

43
Q

What are the 3 options for MR Credit Building Product Disclosure and Optimization – Material Ingredients

A

Opt. 1 : 20 products from 5 manufacturers that meet one of the following : manufacturer inventory, HPD, Cradle-to-Cradle or USGBC approved.
Opt. 2 : use 25% by cost of total permanently installed products by cost that meet either : GreenScreen v1.2 Benchmark, Cradle to cradle certified, REACH or USGBC approved.
Opt. 3 : Product manufacturer supply chain optimization.

44
Q

Describe the requirements for MR Credit PBT Source Reduction – Mercury

A

Specify and install fluorescent lamps w/ both low mercury and long lamp life.

45
Q

Name the three options for MR Credit Construction and Demolition Waste Mgmt

A

Opt. 1 : Divert 50%, at least 3 material streams. (path 1)
Divert 75%, at least 4 material streams. (path 2)
Opt. 2 : Reduce total waste material to 12.2 kg/m2

46
Q

Exemplary performance for MR Credit Construction and Demolition Waste Mgmt?

A

Achieve options 1 and 2

47
Q

What are the points thresholds for IEQ Credit, Daylight for Opt. 1?

A

Minimum 55% sDA (75% for Healthcare) and no more than 10% ASE_1000,250

48
Q

What is the primary requirement for IEQ Credit Quality Views?

A

Achieve a direct line of sight to the outdoors via vision glazing for 75% of all regularly occupied floor area. + additional requirements (at least 2 of 4)

49
Q

Exemplary performance for IEQ Credit Quality?

A

Meet the requirement for 90% of all regularly occupied area.

50
Q

What rating system is required a four-hour charrette for the integration of green strategies?

A

LEED AP BD+C Healthcare

51
Q

A project team must protect which percentage of greenfield area onsite from development and construction to earn SS Credit Site Development – Protect or Restore Habitat?

A

40% of the greenfield area (not of the site)

then, 2 options apply

52
Q

What is the maximum allowed dimension for a bike path/walkway?

A

max 3.5 meters (12’) with an impervious limit of 2.5m (8’)

53
Q

Regional priority credits are specific to

A

LEED Project Type (school, healthcare, data centers)

54
Q

What is excluded when calculating the infill status of a site?

A

Streets, rights of way and water bodies.

55
Q

What is the LEED technical customer service meant for?

A

Provide assistance regarding LEED guidance or processes

56
Q

Reviewing the building operation within 10 months is part of what type of commissioning?

A

Enhanced commissioning.

57
Q

What is created during the integrative process credit?

A

A simple box energy model.

58
Q

What are the 3 things a team need to do to meet the Light Pollution Credit?

A
  1. Meet uplight requirements.
  2. Meet light trespass requirements.
  3. Meet internally illuminated exterior signage requirements.
59
Q

What must be installed for WE Prerequisite Indoor Water Use Reduction?

A

Specify Energy Star Appliances

60
Q

What is required for Enhanced Commissioning?

A
  • the hired person must not be an employee or subcontractor of the construction manager or general contractor and
  • must not be a member of the design team and
  • must have experience on at least 2 other projects.
61
Q

What must be entered in the calculations for toilet design case water use?

A
  • fixture type
  • flush or flow rate
  • fixture manufacturer and model (which should match cutsheets)
  • percentage of occupants using each fixture model. total of all fixtures of each type must be 100% of occupants for standard fixture types.
62
Q

Who is responsible for updating the OPR if the project changes?

A

The owner.

63
Q

Who is responsible for the BOD?

A

The design team.

64
Q

Who is responsible for the Cx Plan?

A

The CxA.

65
Q

Who is responsible for filling out the construction checklists?

A

The contractor is responsible for filling out the checklists and returning it to the CxA.

66
Q

When are the daylighting consultants the most critical?

A

In the simulation process.

67
Q

When are the Cradle to Cradle certification labels, GreenScreen benchmarks, or manufacturer’s declaration (for REACH) required?

A

This is required for MR Credit Building Product Disclosure and Optimization - Material Ingredients, Option 2 Material Ingredient Optimization.

68
Q

When are Copies of all environmental product declarations and life cycle analysis reports required?

A

This is required for MR Credit Building Product Disclosure and Optimization - Environmental Product Declarations, Option 1 EPD Declaration

69
Q

What is accessible to international project to meet the LEED requirements?

A

Global Alternative Compliance Paths

70
Q

what is included in a whole-bldg life-cycle assessment?

A
footings
foundations
structural walls
interior wall cladding
structural floors
ceilings
structural parking

basically : everything in the complete building envelope and structure elements

71
Q

what is excluded from a whole-bldg life-cycle assessment?

A

interior finishes, non-structural walls and MEP