9.Access Work Plan Flashcards

1
Q
  1. Access Work Plan
A

9.1. An access work plan shall be completed prior to beginning all rope access work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  1. Access Work Plan
A

9.2. The access work plan shall be maintained at the worksite and available to all affected persons.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  1. Access Work Plan
A

9.3. The access work plan shall be updated as necessary during the course of rose access work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  1. Access Work Plan
A

9.4. A documented review of the access work plan by rope access technicians shall be conducted prior to each work shift and after any updates.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  1. Access Work Plan
A

9.5. The access work plan should be reviewed by any person affected by the rope access work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  1. Access Work Plan
A

9.6. For new work, a site survey should be conducted to help determine:

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  1. Access Work Plan
A

9.6.1. The nature of the work environment.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  1. Access Work Plan
A

9.6.2. Feasibility of the means of access.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  1. Access Work Plan
A

9.6.3. Foreseeable hazards to rope access technicians and others.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  1. Access Work Plan
A

9.7. The access work plan shall, at a minimum, consist of the following:

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  1. Access Work Plan
A

9.7.1. Work method.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  1. Access Work Plan
A

9.7.2. Risk assessment.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
  1. Access Work Plan
A

9.7.3. Special permits

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
  1. Access Work Plan
A

9.7.4. Rescue plan.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
  1. Access Work Plan
A

9.8. Work Method

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q
  1. Access Work Plan
A

9.8.1. The work method, shall, at a minimum, provide:

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q
  1. Access Work Plan
A

9.8.1.1. Members of the work team by name and identify their roles and level of training.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q
  1. Access Work Plan
A

9.8.1.2. The hazard and fall zones is accordance with Section 10.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q
  1. Access Work Plan
A

9.8.1.3. The communication plan in accordance with Section 11.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q
  1. Access Work Plan
A

9.8.1.4. Required rope access systems in accordance with Section 12.

21
Q
  1. Access Work Plan
A

9.8.1.5. Required rope access equipment in accordance with Section 13.

22
Q
  1. Access Work Plan
A

9.8.1.6. Required tools and other materials in accordance with Section 14.

23
Q

9.Access Work Plan

A

9.8.1.7. Required personal protective equipment(PPE).

24
Q
  1. Access Work Plan
A

9.9. Risk Assessment

25
9. Access Work Plan
9.9.1. The work method and work environment shall be reviewed to identify all hazards that rope access technicians or others may be exposed to during the course of work.
26
9. Access Work Plan
9.9.2. Modifications to the work method and / or controls shall be identified to either eliminate the identified hazards, or to mitigate the associated risk to an acceptable level.
27
9. Access work Plan
9.9.3. If new hazards arise during the course of work, work shall be stopped until appropriate controls have been identified, documented , and implemented .
28
9. Access work Plan
9.9.4. The review of the work method, shall consider, at a minimum:
29
9. Access work Plan
9.9.4.1. The time required for the work at any one location.
30
9. Access work Plan
9.9.4.2. Whether adjacent work may affect the planned work.
31
9. Access work Plan
9.9.4.3. Whether providing security to the anchorage location is warrented.
32
9. Access work Plan
9.9.4.4. Whether any public safety provisions are required.
33
9. Access work Plan
9.9.4.5. Hazards associated with the use of tools, work equipment, and materials required for the work.
34
9. Access work Plan
9.9.5. The review of the work environment shall consider, at a minimum:
35
9. Access work Plan
9.9.5.1. Adverse weather.
36
9. Access work Plan
9.9.5.2. the effects of wind on rope access systems, positioning, and work equipment, and materials required for the work.
37
9.Access work Plan
9.9.5.3. Lock out tag out(LOTO) requirements.
38
9.Access work Plan
9.9.5.4. Potential loose material.
39
9. Access work Plan
9.10. Special permits
40
9. Access work Plan
9.10.1. Special permits shall be determined by the work being conducted.
41
9. Access work Plan
9.10.2. Special permits include:
42
9. Access work Plan
9.10.2.1. Confined space.
43
9 . Access work Plan
9.10.2.2. Hot work.
44
9. Access work Plan
9.10.2.3. Live electrical work.
45
9. Access work Plan
9.11. Rescue Plan
46
9. Access work Plan
9.11.1. The work method and risk assessment shall be reviewed to identify where rescue could be required.
47
9. Access work Plan
9.11.2. Modifications to the work method and/or controls should be identified to facilitate prompt rescue.
48
9. Access work Plan
9.11.3. The rescue plan shall provide procedure's for prompt rescue from the foreseeable scenarios in accordance with Section 16.