4.0 Off-Site Servicing 1: Water, Sanitary and Storm Flashcards

1
Q

Design key references

A

Master servicing studies
Subdivision control bylaws - municipal design criteria
Master municipal Construction Documents
Construction Specification Standards

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

water distribution system

A

Hydraulic Principle
Regional Water Supply
Pressure Zones
Pump Stations
PRV Stations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Key Design Parameters

A

Population (density)
Land use type (fire flow)
Minimum and max residual pressures
Peaking factor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Water Quality Consideration

A

Disinfection of new watermains (chlorination)
Continuous Monitoring of water quality in network

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

sanitary sewage system

A

Every lot with a sanitary connection in region is interconnected all the way to one of the five MVs’ WWTP
Primary Treatment, Secondary Treatment, Tertiary Treatment
Sanitary Pump stations, sanitary force mains

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

storm drainage system

A

Catchment area (pervious and impervious)
Rainfall Return Frequency and intensity
Rational Method
Runoff Hydrograph method
Minor and Major systems (1:100 year) (1:2 - 1:10 year)
Culverts and watercourses

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

service connections

A

Water main, sanitary sewer main, hydro/telephone, and gas main

How well did you know this?
1
Not at all
2
3
4
5
Perfectly