4.0 Off-Site Servicing 1: Water, Sanitary and Storm Flashcards
Design key references
Master servicing studies
Subdivision control bylaws - municipal design criteria
Master municipal Construction Documents
Construction Specification Standards
water distribution system
Hydraulic Principle
Regional Water Supply
Pressure Zones
Pump Stations
PRV Stations
Key Design Parameters
Population (density)
Land use type (fire flow)
Minimum and max residual pressures
Peaking factor
Water Quality Consideration
Disinfection of new watermains (chlorination)
Continuous Monitoring of water quality in network
sanitary sewage system
Every lot with a sanitary connection in region is interconnected all the way to one of the five MVs’ WWTP
Primary Treatment, Secondary Treatment, Tertiary Treatment
Sanitary Pump stations, sanitary force mains
storm drainage system
Catchment area (pervious and impervious)
Rainfall Return Frequency and intensity
Rational Method
Runoff Hydrograph method
Minor and Major systems (1:100 year) (1:2 - 1:10 year)
Culverts and watercourses
service connections
Water main, sanitary sewer main, hydro/telephone, and gas main