Measurement methods of discharge
A
- Volumetric
- Current meter
- Tracer gauging
- Measurement weirs
- Ultra sonic
- Electromagnetic
2
Q
What is the objective of the stage-discharge-curve?
A
Get continuous streamflow Q from a continuous stage h observations.
3
Q
Which is the slowest runoff component?
A
base flow or groundwater flow
4
Q
What is the goal of the hydrograph separation?
A
Separation of total discharge Q
into single flow
components regarding genesis, flow paths, response time
5
Q
Continuous hydrograph separation?
A
separation of multi year hydrographs into
flow components regarding subsystems in the catchment (e.g.
for nutrient balancing or model parameter estimation)
6
Q
Waht is the Event based hydrograph separation and which methods are used?
A
separation of flood hydrograph into base flow and direct runoff for flood modelling. - Straight line method - Fixed base method - Variable slope method