4 Flashcards
1
Q
How are continuing contracts defined?
A
Fixed or unlimited term K for pro services for projects w/:
(a) Estimated construction cost of each individual project does not exceed $4 million,
(b) Fee for each individual study activity does not exceed $500,000.
2
Q
336 [County roads] ----------- DON'T GET CONFUSED ON EXEMPTIONS VS. SELF-BUILD ----------- What exemptions are provided?
A
336 [County roads]
- Emergs.
- Sidewalks.
- Small jobs. Const, repair, incl reseal of bridges + roads, not over 5% of gas tax surplus or $400k, whichever is greater.
3
Q
DON’T GET CONFUSED ON EXEMPTIONS VS. SELF-BUILD
———–
Can Counties build their own roads w/ their own Staff?
A
Yes UNLESS unless funded from the proceeds of County’s 80-percent portion of the surplus of the constitutional gas tax.
4
Q
s
State the S/L for a taking.
A
#s ----------- 4 yrs. ----------- Claim for regulatory taking caused by a plan adoption must be brought within the 4 year statute of limitation from the date property was determined to be unbuildable.
5
Q
S/L ----------- What is S/L for: 1) Torts 2) Ks 3) Exceptions - there are 5.
A
S/L ----------- 4 for Ks + torts (intentional or unintent) EXCEPT (a) 2 for wrongful death. (b) 2/3 for MESs: fMla, Epa, flSa (c) 5 for improper Ordinance.